Laserfiche WebLink
• <br />LJ <br />• 1984 PRIORITIES <br />COMBINATION RESPONSIBILITIES <br />Priori Group Project Current Status <br />1. SH 225/SH 146 Interchange Under design; construction in 1996. <br />Alternate Truck Route to ~ _ Proposed to be deleted. <br />Bazbours Cut Blvd. <br />2. Grade Separation on SH 146 Fairmont Pkwy. complete; Bazbour's Cut <br />at Bazbour's Cut Blvd. and Boulevazd under design. <br />Fairmont Parkway <br />3, SH 225 Completion as Freeway Under construction. <br />to Intersection of SH 146 <br />Underwood Road from Proposed Approximately 50% complete. <br />"S" Street to Fairmont Pkwy. <br />Upgrade to Primary Arterial. <br />• Completion of Bay Area Blvd. from <br />Fairmont Pkwy. to Spencer and Upgrade <br />to Arterial Standard from Spencer to SH 225. <br />Complete Underwood from Proposed Complete <br />. "S" Street to SH 225. <br />Others: Upgrade Fairmont Pkwy. to Semi- <br />controlled Access Highway. <br />Link "L" Street to Barbour's Cut Blvd. Delete <br />• <br />€7fHIeC1' <br />