Laserfiche WebLink
• <br /> <br />• Preliminary Plat Checklist Contd. <br />Page 2 of 2 <br />16. Layout & Identification: <br />17. Condominiums: <br />Shown <br />Nf A' <br />18. Reserves: <br />19. Streets• <br />20. Street Names: <br />21. Utili~ Easements: <br />22. Flood Hazard Area: <br />23. Survey Monument Tie In: <br />24. Survey Control Monuments: <br />25. Schematic Utility Layout: <br />• (If Applicable) <br />B. Documentation <br />NJA <br />Shown (no internal streets) <br />NJA <br />Shown <br />NJA <br />Not shown '1 <br />Shown <br />Submitted on separate plan <br />1. La Porte Development Checklist: Submitted sepazately <br />2. Title Certificate: Submitted separately <br />3. Utility Schematics: Submitted on sepazate plan <br />Comments• <br />Lot 2 is to be developed with apaztments. Thev are rental units to remain under single <br />ownership. As such, they are not considered to be condiminiums. <br />'' Survey monuments: The Development Ordinance requires placement of one survey <br />monument per each five acres of subdivision. This subdivision will require three <br />monuments. Staff will confirm monument placement prior to releasing t~ he plat for <br />recordation. <br />Reviewed By: Date: 12J2f 94 <br />