Laserfiche WebLink
• • <br />#FV97-001 <br />Page 4 of 8 <br />1/16/97 <br />(7) Upon consideration of the factors noted above and the intent of this Ordinance, <br />the Appeal Board may attach such conditions to the granting of variances as it <br />deems necessary to further the purpose and objective of this Ordinance (Article <br />1, Section C). <br />(8) Variances shall not be issued within any designated floodway if any increase in <br />flood levels during the base flood discharge would result. <br />(9) Prerequisites for granting variances: <br />a. Variances shall only be issued upon a determination that the variance is <br />the minimum necessary, considering the flood hazard, to afford relief. <br />b. Variances shall only be issued upon (i) showing a good and sufficient <br />cause; (ii) a determination that failure to grant the variance would result <br />in exceptional hardship to the applicant, and (iii) a determination that the <br />granting of a variance will not result in increased flood heights, additional <br />threats to public safety, extraordinary public expense, create nuisances, <br />cause fraud on or victimization of the public, or conflict with existing <br />local laws or Ordinances. <br />c. Any application to whom a variance is granted shall be given written <br />notice that the structure will be permitted to be built with the lowest floor <br />elevation below the base flood elevation, and that the cost of flood <br />insurance will be commensurate with the increased risk resulting from the <br />reduced lowest floor elevation. <br />(10) Variances may be issued by La Porte for new construction and substantial <br />improvements and for other development necessary for the conduct of a <br />functionally dependent use provided that (i) the criteria outlined in Article 4, <br />Section D(1)-(9) are met, and (ii) the structure or other development is protected <br />by methods that minimize flood damages during the base flood and create no <br />additional threats to public safety. <br />Conclusion: <br />The requirements to build in a floodway are highly technical and a No-Rise Certification <br />must be submitted by the applicant and approved by the City to build in the Floodway. <br />