My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-18-1999 Regular Meeting of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
1990's
>
1999
>
02-18-1999 Regular Meeting of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 2:53:00 PM
Creation date
3/21/2025 2:55:03 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
2/18/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 0 <br />protective covenants and deed restrictions will apply to and be binding <br />upon the Tract, and shall be in form substantially similar to Exhibit "E". The <br />covenants and deed restrictions shall be approved by the City and shall be <br />recorded concurrently with each recorded plat. <br />ARTICLE IV. TERMINATION <br />4.1 Term. <br />This Agreement shall have a term commencing on the date first written <br />above, and continuing until the sooner to occur of (i) the date in which all <br />portions of the Tract have been platted and developed (with construction of <br />all streets and utilities on the Tract as reflected by the plats completed or <br />installed and financed by the Owner -Developer). <br />Failure of Owner -Developer to begin construction in accordance with the <br />Special Conditional Use Permit within one year after issuance of said <br />permit, or as scheduled under the terms of the Special Conditional Use <br />Permit, shall terminate this Agreement. Owner -Developer may, before the <br />expiration of one year, request an extension of time from the Planning and <br />Zoning Commission, in the event that construction has not started in <br />accordance with the Special Conditional Use Permit. <br />ARTICLE V. OPEN SPACE/TRAIL, BUFFERING AND <br />BEAUTIFICATION <br />5.1 Open Space/Pedestrian Trail System. The Owner -Developer shall <br />provide common open space as shown in Comprehensive Plan and the <br />General Plan, including any required portion of planned City trail system <br />within the project. This will be incorporated within the shown drainage <br />easement and detention pond/drainage system, the cross-section details of <br />which are further illustrated on the attached Exhibit F. <br />It is recognized that, until the final design of the detention pond/drainage <br />system is approved, the exact location and dimensions of these facilities is <br />unknown. When the final design is approved the City will evaluate the <br />potential for use of these areas as public recreation amenities. <br />At that time and with mutual consent, the City may elect to accept these <br />facilities either in easement or fee. The initial development, of the <br />detention pond/drainage system and perimeter landscaping of these <br />facilities shall be the responsibility of the Owner - Developer. The <br />responsibility of ongoing maintenance of these facilities shall also be <br />determined after reviewing the final design. <br />
The URL can be used to link to this page
Your browser does not support the video tag.