Laserfiche WebLink
Fairmont Park East, S. V~Preliminary Plat • <br />11/18/99 - P & Z Meeting <br />Page 2 of 2 <br />Staffwould note that Section 5.02 of the Development Ordinance empowers <br />the Commission to require pedestrian sidewalks when it feels their inclusion <br />will serve the public interest. Staff recommends the inclusion of sidewalks <br />within the Fairmont Park East Subdivision. Responsibility for construction <br />of the wallcs should be specified by covenant as well as stated in writing on <br />the front of the final plat document for each section. <br />Staff has listed items below that need to be addressed by the developer with <br />the submittal of the final plat. <br />• Payment of $438.91 shall be made to the City for street sign installation. <br />• Payment for street lighting in the amount of $6,663.68 shall be made to <br />the City. <br />• Approval from the franchise utilities regarding the size and location of <br />the proposed utility easements shall be provided for City review and <br />approval. <br />• Construction drawings for water, sewer, paving & drainage shall be <br />submitted for review by staff. <br />• Payment of $11,900.00 is due to the City in lieu of parkland dedication. <br />This figure is based on a $175.00 per dwelling unit. The money will be <br />placed in an escrow account and will only be used for the acquisition or <br />improvements of public park land or facilities located in Park Zone 6, the <br />zone in which Fairmont Park East is located. <br />• Subdivision covenants/deed restrictions for Section VII shall be provided <br />to the City for review and approval. <br />Conclusion: Staff has reviewed the plat and found it to be in accordance with the <br />zoning and development ordinance of the City. Staff recommends <br />.approval of the preliminary plat for Fairmont Park East Section VII. <br />