Laserfiche WebLink
P&O Cold Logistics • • <br />2/15/01 P&Z <br />Page 2 of 4 <br />The City Council at its September 11, 1989 meeting, passed and approved <br />Ordinance 1501-K, which authorized the P.U.D. zoning of the said property <br />with an underlying Commercial/Industrial land use for this area. This <br />designation was found to be compatible with the goals and objectives of the <br />Comprehensive Plan. <br />A Special Conditional Use Permit #SCU90-002 was then approved by the <br />City on_ April 9, 1990 for the development of International Cargo Network at <br />502 North Broadway with the following conditions in place: <br />i) A driveway entrance width shall be minimum of thirty (30) feet <br />along.Barbours Cut Boulevard. <br />ii) A utility easement of twenty (20) feet in width for a distance of 1,340 <br />feet to the property corner located at North Broadway and . the <br />southern boundary of the North "E" Street right-of-way, shall be <br />dedicated to the City of LaPorte. <br />iii) A landscape setback area thirty (30) feet in width shall be developed <br />along the southern and eastern sides of the area. <br />All these conditions have been met for the previous SCUP. <br />The current owner, P & O Cold Logistics, a major food service distribution <br />company, which will serve as its central distribution point for the Texas area, <br />is proposing a 65,061 square foot cold storage/warehouse addition to its <br />present 155,657 square foot facility. The development in a PUD zoning <br />district requires that an application for a General Plan shall be filed and <br />processed simultaneously with the Special Conditional Use Permit (for the <br />proposed phase 2 of the development). Upon approval of the General Plan <br />and SCUP, the applicant would be authorized to submit a Major <br />Development Site Plan. <br />Analysis: In addition to performance standards, there are a number of development <br />standards that are specified by the Zoning Ordinance. These standards are <br />applicable to all P.U.D. developments. Section 106-659- of the Code of <br />Ordinances establishes the following criteria for review of the development <br />projects within a P.U.D. zoning district: <br />Uses — Review of the City's updated Land Use Plan indicates that the area <br />for this expansion is envisioned as a Commercial/Industrial use. The first <br />phase was completed in 1991. In the first phase, there is a large cargo <br />building with existing loading docks as well as a rail spur for the flow of <br />goods. The existing building and truck parking/employee parking areas are <br />built in the BI and PUD zoned area. The detention pond and setback areas <br />are located in an R 2 zone. There is plenty of freight parking on existing <br />concrete pavement to the east of the building. The proposed phase two is an <br />expansion of existing storage/warehouse building. The proposed addition <br />will consist of multi temperature freezer storage areas with static storage <br />racks. As per project description, it is designed to house refrigerated shipping <br />