Laserfiche WebLink
SCU02-001 <br />Page 3 of 3 <br />r~ <br />LJ <br />• No overnight facilities are allowed on the premises. <br />• North 3'~ Street will be improved south of the existing paving for <br />approximately 270'. <br />Staffs conditions <br />• At least 15% landscaping and screening must be provided along 1 ~`, 3'~, <br />and North "E" streets as a buffer between the neighborhood and the <br />proposed facility. This must be compatible with current landscaping <br />scheme along Bazbour's Cut Blvd. <br />• No permanent structures are allowed in the City's 60' drainage <br />easement. <br />• For this phase of development, ingress and egress are limited to 2 points <br />along Bazbour's Cut Blvd. The second driveway provides shared access <br />between Blocks 328 & 329. <br />• Applicant must submit to the City written approval from Harris County <br />for median break(s) along Barbour's Cut Blvd. <br />• Driveway turning radii shall be increased to accommodate tnucks. <br />• Automobile and truck traffic must be sepazated. Signs aze placed at each <br />driveway denoting "auto" or "truck" entrance%xit. <br />• Street improvement must adhere to the Harris County Engineering <br />Department's design standards for commerciaVindustrial roadways. <br />Options available to the Commission aze: <br />1. Approve the SCUP as submitted by the applicant <br />2. Approve the SCUP with specific conditions either recommended by <br />staffor by the Commission . <br />3. Disapprove the SCUP as submitted <br />A recommendation from the Commission on this SCUP will be forwarded to <br />City Council for final consideration. If the SCUP is approved by the City <br />Council, the applicant must submit a site plan noting the SCUP number. <br />Construction must begin. or a time extension must be filed within one yeaz <br />after the issuance or the permit shall become void. (See Exhibit E -Draft <br />SCU#02-001.) <br />