My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-18-2002 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2002
>
04-18-2002 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:34 AM
Creation date
3/21/2025 2:55:37 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
4/18/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Fairmont Park East, .on V - Preliminary Plat <br />5/16/02 - P & Z Meeting <br />Page 3 of3 <br /> <br />Conclusion and <br />Recommendation: <br /> <br />. <br /> <br />Section Five. If the intent is for these properties to continue to drain into the <br />detention pond, future drainage plans for these commercial developments <br />must be shown on the Construction drawings for Section Five. Otherwise, <br />these properties must provide individual on site detention. <br /> <br />The proposed Section Five was designed so that all storm drainage flows <br />directly into the detention pond. (The City prohibits any direct drainage onto <br />Driftwood Drive.) The pond's size and capacity were reviewed to ensure that <br />it can adequately serve the proposed development without burdening the <br />existing system. The developer shall provide all the necessary easements <br />required for proper drainage, including storm water inlets. <br /> <br />The Preliminary Plat is in accordance with the City's development <br />regulations. Staff recommends approval of the Preliminary Plat with the <br />following conditions: <br /> <br />. Construction drawings shall indicate off-site drainage improvements to <br />ensure proper drainage of the adjacent commercial property and pipeline <br />corridor. <br /> <br />. As agreed to in the General Plan, the developer is responsible for <br />installation of sidewalks along both sides of all public streets within the <br />subdivision and along east and west right-of-way line of Driftwood <br />Drive towards the end of the subdivision line. <br /> <br />Options available to the Commission are as follows: <br /> <br />. Approval of the Preliminary Plat authorizes the developer to submit a <br />Final Plat. <br /> <br />. Conditional approval of the Preliminary Plat requires submission of an <br />amended' Preliminary Plat and additional documentation as specified by <br />the Commission for final Commission approval. <br /> <br />· Disapproval of the Preliminary Plat requires submission of a new <br />Preliminary Plat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.