My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-20-2003 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2003
>
02-20-2003 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 2:53:39 PM
Creation date
3/21/2025 2:55:46 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
2/20/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />Zone Change Request #R 03-002 <br />P & Z Mar 20, 2003 <br />Page 2 of 3 <br />Transportation Both tracts gain access using Farrington Boulevard, a <br />minor arterial with 100' ROW, which provides access to Fairmont Parkway <br />and Spencer Highway. However, Farrington Boulevard median cut and its <br />alignment with the access points of the proposed development will be <br />reviewed carefully at the time of plat submittal. Fairmont Parkway, a semi - <br />controlled access highway with 250' ROW, should accommodate the traffic <br />generated by development. <br />Parks and Recreation — The nearest park facility is in Fairmont Park <br />Central Section 2 along Farrington Boulevard at Collingswood. This facility <br />serves the parks and recreation needs of several neighborhoods within a 1 to <br />2 mile radius. At the time of platting, attention should be given to pedestrian <br />connectivity. The subject tracts would provide the needed access to connect <br />Big Island Slough to the Exxon -Mobil pipeline in the City's pedestrian plan. <br />Utilities — The infrastructure was not analyzed in detail to ensure that <br />sufficient capacity exists. This analysis will occur when subdivision plats <br />are submitted. In addition, the developer must provide any structures or <br />improvements necessary to serve future development. Storm water drainage <br />and detention is also an issue that will be carefully reviewed as a project <br />develops. Staff recommends on -site detention for any future development. <br />Residential Development — The intent of the Comprehensive Plan is to <br />provide for attractive low -density residential neighborhoods. The <br />neighborhood protection standards applicable to this project may include <br />physical screening, increased setbacks, and use of open space buffers. When <br />reviewing the subdivision plat, the Commission may consider additional <br />buffering between land uses. <br />In addition, Staff does not recommend leaving the small GC tract on <br />Farrington Blvd. The Commission should consider modifying the <br />applicant's request by adding undeveloped GC areas not included in the <br />request. This may provide flexibility when preparing future subdivision <br />layout. The Commission should also consider the impact of leaving the GC <br />along Fairmont Parkway unless covenants are in place to limit driveway <br />access on this tract. <br />Conclusion: Staff suggests that during plan review, items such as increased setbacks and <br />deeper lots be considered to buffer the Low -Density Residential (R 1) from <br />the General Commercial (GC). At this time, Staff recommends that the <br />Planning and Zoning Commission approve this rezone request, as it <br />represents the highest and best use of the property. Furthermore, the request <br />supports the goals and objectives of the Comprehensive Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.