My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-15-2004 Regular Meeing and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2004
>
01-15-2004 Regular Meeing and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 2:55:38 PM
Creation date
3/21/2025 2:56:02 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
1/15/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fairmont Park East, Section Eleven (Final Plat) <br />Planning and Zoning Cossion • <br />February 19, 2004 <br />Location of Proposed Subdivision <br />Myrtle Creek Drive and Spencer Highway <br />Legal Description <br />W.M. Jones Survey, Abstract 482 Harris Count <br />Applicant <br />Eddie V. Gray <br />Present Zoning <br />Low Density Residential -1 <br />Requested Zoning <br />Low Density Residential (R 1) <br />Acreage to be considered <br />19.3756 acres <br />Surrounding Zoning <br />North Low Density Residential (R 1) <br />East Low Density Residential (R 1) <br />South Spencer Highway & GC <br />West General Commercial <br />Land Use Map <br />Mid to High density Residential <br />Activity Proposed <br />Single-family residential dwellings <br />Summary: <br />On April 14, 2003, City Council approved the Commission's recommendation and <br />established Ordinance #1501-YY rezoning of 19.3756 acres of land along the east <br />and west sides of Myrtle Credo Drive just north of Spencer Highway from General <br />Commercial (GC), Neighborhood Commercial (NC), and High Density Residential <br />(R-3) to Low Density Residential (R 1) for proposed development of Fairmont Park <br />East Section Eleven. <br />At the Commission's October 16, 2003 meeting, the preliminary plat for <br />Fairmont Park East, Section Eleven was approved with conditions. As a part of <br />the Commission's conditional approval of the preliminary plat, the applicant <br />submitted a rezone request for unrestricted reserve along Spencer Highway. The <br />Planning and Zoning Commission held a public hearing at their November 20, 2003 <br />meeting and recommended it to City Council. City Council approved the zone <br />change request at their January 12, 2004 meeting. <br />Staff reviewed the final plat with all required documentation and construction <br />drawings and found it be in substantial compliance with all applicable regulation <br />of the ordinance. Staff recommends approval of the final plat subject to the <br />Recommendation: following provisions: <br />• All construction improvements are complete at site. <br />• Furnish approval letter from the Harris County Flood Control District <br />(HCFCD) for the drop structure on Big Island Slough. <br />• Sidewalks shall be installed along both sides of all public streets and <br />along detention area to connect block 2 and block 3. <br />• Sidewalks are constructed along north side of Spencer Highway on both <br />directions leading to the Big Island Slough on the east and towards west <br />end of the subdivision. <br />• Add a note on the face of the plat that maintenance of 20' utility <br />easement, drop structure to Big Island Slough, and the detention basin <br />will be the sole responsibility of the Homeowner Association. <br />• Payment of $319.41 shall be made to the City for street sign installation. <br />• Payments shall be made to the City in the amount of $2760.00 and <br />$2355.84 for twelve (12) streetlights installation and 1-year service cost. <br />• Payment of $10,850.00 shall be made to the City in lieu of parkland <br />dedication. <br />Action Required by Approval of the Final Plat withholding signature and recordation until above are <br />the Commission: complied. This will aWorize the developer to begin construction of <br />subdivision improvements. <br />Disapproval of the Final Plat and supporting documents as filed. This will <br />require the developer to file a new Final Plat with the required documents. <br />zA HIBI i' A <br />
The URL can be used to link to this page
Your browser does not support the video tag.