My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-18-2005 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2005
>
08-18-2005 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:33 AM
Creation date
3/21/2025 2:56:32 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
8/18/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Preserve at Taylor Bayou <br />September 15, 2005 <br />Page 4 of 4 <br /> <br />e <br /> <br />. <br /> <br />. Developer must secure a maintenance bond, according to the City's <br />multi-family provisions, or seek an approved alternate showing <br />evidence of bonding insurance or participate in a "reserve fund <br />mechanism" that establishes an account for the sole purpose of <br />maintenance to the apartment project. This fund is for the lifetime of <br />the project. <br /> <br />. Detention ponds ownership and maintenance by the HOA shall be stated <br />on the final plat. <br /> <br />. Delineate detention ponds 1 &2 within the proposed plat boundary. <br /> <br />. Furnish acceptance letter for proposed 40' HCFCD drainage easement <br />shown along eastern property line adjacent to the Taylor Bayou. <br /> <br />. Detention ponds approval by the Harris County and Army Corps of <br />Engineers must be provided to the City. <br /> <br />. Nature Preserve dedication instrument, ownership and responsibility <br />for its maintenance must be established and noted 'on the plat. <br /> <br />. Coordinate with the developer to the north for the construction of a <br />24" trunk main, the portion of the lift station to be built north of the <br />site, and off-site lift station that needs to be upgraded to handle both <br />north and south developments. <br /> <br />. Show other features like Wetlands delineation, SW Bell Station, and <br />public parkland. <br /> <br />Options available to the Commission are as follows: <br /> <br />. Approval of the Preliminary Plat, as filed. nus will authorize the <br />developer to proceed with the [mal plat submittal. <br />. Conditional approval of the Preliminary Plat as filed. This will require <br />the developer to address the conditions and resubmit the Preliminary <br />Plat. <br />. Disapproval of the Preliminary Plat as filed. This will require the <br />developer to file a new Preliminary Plat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.