Laserfiche WebLink
<br />Preserve at Taylor Bayou <br />September 15, 2005 <br />Page 4 of 4 <br /> <br />e <br /> <br />. <br /> <br />. Developer must secure a maintenance bond, according to the City's <br />multi-family provisions, or seek an approved alternate showing <br />evidence of bonding insurance or participate in a "reserve fund <br />mechanism" that establishes an account for the sole purpose of <br />maintenance to the apartment project. This fund is for the lifetime of <br />the project. <br /> <br />. Detention ponds ownership and maintenance by the HOA shall be stated <br />on the final plat. <br /> <br />. Delineate detention ponds 1 &2 within the proposed plat boundary. <br /> <br />. Furnish acceptance letter for proposed 40' HCFCD drainage easement <br />shown along eastern property line adjacent to the Taylor Bayou. <br /> <br />. Detention ponds approval by the Harris County and Army Corps of <br />Engineers must be provided to the City. <br /> <br />. Nature Preserve dedication instrument, ownership and responsibility <br />for its maintenance must be established and noted 'on the plat. <br /> <br />. Coordinate with the developer to the north for the construction of a <br />24" trunk main, the portion of the lift station to be built north of the <br />site, and off-site lift station that needs to be upgraded to handle both <br />north and south developments. <br /> <br />. Show other features like Wetlands delineation, SW Bell Station, and <br />public parkland. <br /> <br />Options available to the Commission are as follows: <br /> <br />. Approval of the Preliminary Plat, as filed. nus will authorize the <br />developer to proceed with the [mal plat submittal. <br />. Conditional approval of the Preliminary Plat as filed. This will require <br />the developer to address the conditions and resubmit the Preliminary <br />Plat. <br />. Disapproval of the Preliminary Plat as filed. This will require the <br />developer to file a new Preliminary Plat. <br />