My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-15-05 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2005
>
12-15-05 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:33 AM
Creation date
3/21/2025 2:56:39 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
12/15/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Retreat at Bay Forest (N&S) - Preliminary Plat <br />1/19/06 - P & Z Meeting <br />Page 2 of3 <br /> <br />Land Use - The project's proposed residential use conforms to the character <br />of the surrounding land uses and Low-Density Residential (R-1) zoning <br />district. Properties adjacent to the subject site are overwhelmingly <br />residential, with mid to high density residential uses along South Broadway. <br />The area is intended for residential use in the La Porte Comprehensive Plan <br />and Land Use Plan. <br /> <br />TransportationlInterior Circulation - The north section is located just <br />south of West "s" Street, an unimproved public right-of-way which dead <br />ends into the Bay Forest Golf Course. The City has allowed the developer to <br />improve a portion of this street, per City's standards (PICM) to use as an <br />entrance/exit off South Broadway. A 50' right-of-way with a cul-de-sac <br />street off West "S" Street will serve the North subdivision. Staff suggests <br />the opening of this public street through the South property, which will <br />require a 50'wide dedication/easement to the City between lots 9 and 10. <br />This area could remain open and green for future projection. <br /> <br />The proposed South section will have an entrance/exit off South Broadway <br />approximately 260' south of the intersection at Wharton Weems Boulevard. <br />The developer is required to gain approval of this drive from the Texas Dept. <br />of Transportation (TxDOT). Interior circulation in both the subdivisions <br />appears to be adequate. Wharton Weems Boulevard and South Broadway <br />(Old Highway 146), primary arterials with 100' of ROW, should <br />accommodate the traffic generated by these developments. <br /> <br />Sidewalks - The developer shall be responsible for construction and <br />installation of sidewalks within the subdivision and language to that effect <br />shall be stated in writing on the plat. In addition, the developer shall <br />construct sidewalks along both sides of all public streets within the <br />subdivision and south of South "S" Street up to S. Broadway. <br /> <br />Parks and Recreation - Section 12.0 of Development Ordinance #1444 <br />requires the developer to provide either on-site open space and recreational <br />space or remittance of fees in lieu of parkland to the City. The area of land <br />dedicated to the City for parkland purposes shall equal one acre for each 160 <br />proposed dwelling units. The total number of lots for this project equals 28. <br />Therefore, a monetary fee in lieu of parkland would be required at, or prior <br />to, approval of the Final Plat. <br /> <br />Utilities - There is sufficient water service available to serve these proposed <br />developments. Originally, this area was a part of the potentially overloaded <br />sewer system per South La Porte Wastewater Report. Later, improvement of <br />wastewater system around Texas Avenue and closing of Vista Baywood <br />Apartments provided enough relief. An upgrade of the system from <br />Broadway to McCabe Road should provide relief to the current sanitary <br />sewer system. The developer is responsible for providing all on-site <br />infrastructure and any improvements necessary to accommodate the <br />subdivision's water and sanitary sewer needs. The design and construction of <br />all water and sewer systems shall be in conformance with the City's <br />approved Public Improvement Criteria Manual (PICM). <br />
The URL can be used to link to this page
Your browser does not support the video tag.