My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-15-05 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2005
>
12-15-05 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:33 AM
Creation date
3/21/2025 2:56:39 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
12/15/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Port Crossing, Section 1 <br />Preliminary Plat <br />Page 3 of3 <br /> <br />Conclusion and <br />Recommendation: <br /> <br />reviewed with the construction drawings. The proposed pump detention <br />system is temporary, as per verbal agreement reached on January 6, 2006 <br />between the developer and the City. The pumped detention facility will <br />utilize a dual-pump system with head curves and discharge from the site <br />shall be restricted to the existing 3-year event. <br /> <br />The approved Special Conditional Use Permit (#SCUOS-003), General Plan, <br />and Developer's Agreement are the prevailing documents for this <br />development. This plat complies with some of the elements of the principal <br />documents. Staff reviewed the Preliminary Plat for Port Crossing, Section 1 <br />and found it to be in compliance with the Development Ordinance. Staff <br />recommends approval of the preliminary plat with the following conditions: <br /> <br />. Provisions of the approved SCUP, General Plan, and Development <br />Agreement are applicable and must be applied to the entire project. <br />. Pump stations are not allowed unless approved by the City on a case by <br />case basis. <br />. Construction drawings should be prepared as per City's Standard Specs. <br />or details contained in PICM. <br />. Final construction drawings shall indicate off-site drainage <br />improvements to ensure proper drainage of the adjacent property. <br />. Final Plat and construction drawings shall provide details showing 12' <br />perimeter around the detention basin. <br />. Add the following statement on the plat: "Developer shall dedicate 40' <br />wide strip to the East for the future widening of Powell Road." <br />. The Drainage Plan requires approval by Harris County. The detention <br />pond and maintenance thereof will be the sole responsibility of the <br />owner/developer. <br /> <br />Options available to the Commission are as follows: <br /> <br />. Approval of the Preliminary Plat, as filed. This will authorize the <br />developer to proceed with the final plat submittal. <br />. Conditional approval of the Preliminary Plat as filed. This will require <br />the developer to address the conditions and resubmit the Preliminary <br />Plat. <br />. Disapproval of the Preliminary Plat as filed. This will require the <br />developer to file a new Preliminary Plat upon completion of the <br />provision of the Developer's Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.