My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-25-06 Special Called Regular Meeting and Workshop of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2006
>
05-25-06 Special Called Regular Meeting and Workshop of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:33 AM
Creation date
3/21/2025 2:56:46 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
5/25/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Underwood Business Park <br />SCUP #06-002 <br />6/15/06 P&Z Meeting <br />Page 2 on <br /> <br />Conclusion! <br />Recommendation <br /> <br />north of this development. In addition, the Battleground Industrial <br />District - Extra Territorial Jurisdiction (ETJ) of La Porte is located <br />north of State Highway 225. <br /> <br />Transportation - The project is located near State Highway 225 and <br />Battleground Road, a primary arterial and major truck route. As a result, <br />this project provides more than adequate accessibility for circulation of <br />traffic. All traffic entering/existing will be through Porter Road along <br />Old Underwood Road. There should be very limited impact on traffic <br />flow within the vicinity, even after full implementation of the said <br />business park. In addition, the traffic shall not be directed south of <br />Underwood Road. <br /> <br />Topography - This area is relatively flat and stable and should not be <br />an obstacle to this type of development. <br /> <br />Utilities and Drainage - Public facilities and services are sufficient to <br />handle the supply of potable water, but require upgrading for fIre <br />protection in the area. In addition, provisions must be made to ensure <br />sufficient utility extensions are provided to serve this development. <br />Storm water drainage will be managed by on-site detention to mitigate <br />any adverse impacts associated with this proposed development. <br /> <br />Staff feels that the project has potential and would make a signifIcant <br />impact on economic development within the City of La Porte. Based <br />on the above analysis, staff recommends approval of the General Plan <br />and Special Conditional Use Permit with the following conditions: <br /> <br />. This Special Conditional Use Permit is not applicable to any <br />specifIc development anticipated or proposed by the General Plan. <br /> <br />. This SCUP outlines, in general terms, the proposed Planned Unit <br />Development. The developer recognizes and understands that any <br />future construction or development of the private or public <br />improvements anticipated by this SCUP and General Plan shall <br />require further submittal and approval of plats, site plans, <br />construction drawings, engineering analysis, covenants, etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.