My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-19-08 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission Minutes
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2008
>
06-19-08 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:33 AM
Creation date
3/21/2025 2:57:11 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
6/19/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />#R 08-00] <br />P&Z 7/17/08 <br />Page 4 of 4 <br /> <br />Conclusion! <br />Recommendation: <br /> <br />Utilities - Currently, the site has sufficient water and sewer facilities to <br />serve this development. It will be applicant's responsibility to provide any <br />structures or improvements necessary to accommodate increased demand of <br />water and sanitary sewer for future development. Storm water management <br />is also an issue that will be carefully reviewed with the site development <br />plan. On-site detention shall be required for the property. Neighboring <br />residents have voiced their concerns about flooding and improper drainage <br />of the facility. <br /> <br />Based on the above analysis, staff finds that the requested change is not <br />compatible with the present zoning and current uses of the nearby properties. <br />Staff recognizes the impact of being unable to utilize the contiguous property <br />for a use, which previously exists on the tract. The change from General <br />Commercial (GC) and Large Lot Residential (LL) to Planned Unit <br />Development (PUD) would have long range impact on the future <br />development of this area. In addition, it is contrary to the intent of the Land <br />Use element of the Comprehensive Plan and compromises the optimal <br />viability of the remaining undeveloped residential zoned property. <br /> <br />It should be noted that the general commercial portion of the facility has <br />operated legally as a nonconforming use. Approval or denial of this request <br />will in no way interfere with this facility's right to continue to operate in this <br />manner in the future. However, because the applicant previously lost the use <br />of the rear of the facility for storage/exterior fabrication, a POO is the only <br />way to regain the use for that purpose. <br /> <br />A Planned Unit Development (PUD) zone might be considered for a defmed <br />transitional period allowing limited industrial use with the eventual <br />implementation of the underlying land use at the end of said transitional <br />period as applied in the Special Conditional Use Permit (SCUP). <br /> <br />Options available to the Commission are: <br /> <br />· Recommend to Council approval of this rezoning request. <br />· Recommend to Council denial of this rezoning request. <br />· Table the item for further consideration by the Commission. <br />
The URL can be used to link to this page
Your browser does not support the video tag.