Laserfiche WebLink
<br />Landfill Site #3 <br />Site Plan <br />Page 2 of3 <br /> <br />SCS Engineers Submittal <br /> <br />14. Proposed surface material does not comply with the City's specification of dust free surface. <br />PICM allows either asphalt or concrete. <br /> <br />15. Maximum allowable ditch cross slope is 4:1. <br /> <br />16. Please provide erosion protection measures for the high velocities in the access road ditches <br />where slopes result in velocities greater than 9 feet/sec. <br /> <br />17. It appears a large portion of the site will be draining toward Broadway Street. Half of the site is <br />draining toward the access road's channel and from STA. 2+50.84 onward this appears to be <br />discharging to Broadway. Broadway is not a City of La Porte maintained street and provisions for <br />outfalling to Broadway must satisfy Harris County criteria. From reviewing the existing <br />conditions it appears there is a change in the amount of runoff reaching Broadway. <br /> <br />18. Please provide a flood plain statement on Sheet 9. <br /> <br />19. Please provide detention pond volume calculations on Sheet 9. <br /> <br />Site Plan <br /> <br />20. Perimeter fence with height, material, and location is not shown either proposed or existing <br />on the site plan. <br /> <br />21. Indicate location, widths, and types of all existing and proposed easements. Indicate recording <br />information for existing easements. <br /> <br />22. Show the nearest fire hydrant location on the site plan. <br /> <br />23. Show landscaping or submit a landscape plan showing minimum 6% required landscaping <br />(approx. 125,000 sq.ft.) around the perimeter boundary of the property. An irrigation/landscape <br />meter is recommended for the proper maintenance of landscaping at site. Show proposed tap <br />and line size on the site plan. <br /> <br />24. All new fencing and signage shall require separate permit from the City. <br /> <br />25. Need sanitation for workers at site. Is dumpster proposed? Show location on the site plan. <br /> <br />26. 15" sanitary sewer not depicted correctly. Sewer extends both north and south of manhole <br />called out at N. 81h and "J" Street. <br /> <br />27. Storm sewer manhole called out on west side of project is sanitary sewer. <br /> <br />28. Call out portion of"J" Street as improved flexible base and asphalt roadway. <br /> <br />29. Fill Dirt Permit is required from the City prior to placement of any fill at site. <br /> <br />30. The cost of the water development fee is $15,282.20. <br /> <br />31. The cost of the sewer development fee equals $35,371.80. <br /> <br />32. Zoning permit fee $50.00 is applicable. <br />(Note: All fees are due at the building permit issuance.) <br />