My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-21-11 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2011
>
04-21-11 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:32 AM
Creation date
3/21/2025 2:57:44 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
4/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West F Street <br /> Concrete Pavement : <br /> Remove Existing Pavement 1442 SY $7.00 $10,095.56 <br /> Lime Stabilization 36 ' Ton $75.00 $2,704.17 <br /> Fly Ash Stabilization 14 Ton $145.00 $2,091.22 <br /> 10 Inch Rienforced Concrete Pavement 1442 SY $36.00 $51,920.00 <br /> Total $66,810.94 <br /> Aspahlt Pavement: <br /> Remove Existing Pavement 1442 SY $7.00 $10,095.56 <br /> Lime Stabilization 36 Ton $75.00 $2,704.17 <br /> Fly Ash Stabilization 14 Ton $145.00 $2,091.22 <br /> Limestone Base 811 Ton $30.00 $24,337.50 <br /> 1.5 Inch HMAC 105 Ton $75.00 $7,909.69 <br /> Subtotal $47,138.13 <br /> Maintenance (resurface every 7 years) 7 EA $7,909.69 $55,367.81 <br /> Total $102,505.94 <br /> South 14th Street mprovements <br /> Concrete Pavement : <br /> Site Preparation 1.82 AC $2,500.00 $4,545.45 <br /> Roadway Excavation 3129 CY $2.50 $7,822.22 <br /> time Stabilization 78 Ton $75.00 $5,866.67 <br /> Fly Ash Stabilization 31 Ton $145.00 $4,536.89 <br /> 10 Inch Rienforced Concrete Pavement 3227 SY $36.00 $116,160.00 <br /> Total $138,931.23 <br /> Aspahlt Pavement: <br /> Site Preparation 1.82 AC $2,500.00 $4,545.45 <br /> Lime Stabilization 81 Ton $75.00 $6,050.00 <br /> Fly Ash Stabilization 32 Ton $145.00 $4,678.67 <br /> Limestone Base 1815 Ton $30.00 $54,450.00 <br /> 1.5 Inch HMAC 236 Ton $75.00 $17,696.25 <br /> Subtotal $87,420.37 <br /> Maintenance (resurface every 7 years) 7 EA $17,696.25 $123,873.75 <br /> Total $211,294.12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.