Laserfiche WebLink
West F Street <br /> Concrete Pavement : <br /> Remove Existing Pavement 1442 SY $7.00 $10,095.56 <br /> Lime Stabilization 36 ' Ton $75.00 $2,704.17 <br /> Fly Ash Stabilization 14 Ton $145.00 $2,091.22 <br /> 10 Inch Rienforced Concrete Pavement 1442 SY $36.00 $51,920.00 <br /> Total $66,810.94 <br /> Aspahlt Pavement: <br /> Remove Existing Pavement 1442 SY $7.00 $10,095.56 <br /> Lime Stabilization 36 Ton $75.00 $2,704.17 <br /> Fly Ash Stabilization 14 Ton $145.00 $2,091.22 <br /> Limestone Base 811 Ton $30.00 $24,337.50 <br /> 1.5 Inch HMAC 105 Ton $75.00 $7,909.69 <br /> Subtotal $47,138.13 <br /> Maintenance (resurface every 7 years) 7 EA $7,909.69 $55,367.81 <br /> Total $102,505.94 <br /> South 14th Street mprovements <br /> Concrete Pavement : <br /> Site Preparation 1.82 AC $2,500.00 $4,545.45 <br /> Roadway Excavation 3129 CY $2.50 $7,822.22 <br /> time Stabilization 78 Ton $75.00 $5,866.67 <br /> Fly Ash Stabilization 31 Ton $145.00 $4,536.89 <br /> 10 Inch Rienforced Concrete Pavement 3227 SY $36.00 $116,160.00 <br /> Total $138,931.23 <br /> Aspahlt Pavement: <br /> Site Preparation 1.82 AC $2,500.00 $4,545.45 <br /> Lime Stabilization 81 Ton $75.00 $6,050.00 <br /> Fly Ash Stabilization 32 Ton $145.00 $4,678.67 <br /> Limestone Base 1815 Ton $30.00 $54,450.00 <br /> 1.5 Inch HMAC 236 Ton $75.00 $17,696.25 <br /> Subtotal $87,420.37 <br /> Maintenance (resurface every 7 years) 7 EA $17,696.25 $123,873.75 <br /> Total $211,294.12 <br />