My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-20-12 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2012
>
09-20-12 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 2:57:08 PM
Creation date
3/21/2025 2:57:47 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
9/20/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning and Zoning Commission <br />Minutes of September 20, 2012 <br />Page 3 of 4 <br />• Change the Future Land Use Plan for the area that includes the detention pond between <br />S. 16th St. and SH 146 S, within the Port Crossing Business Park, from Parks and Open <br />Space to Business Industrial. <br />• Leave the first four (4) lots off Fairmont Parkway (two blocks east of City Hall) as <br />Commercial and change the remainder of lots in the block, up to W. "I" St., to Low <br />Density Residential on the Future Land Use Plan. <br />• Change the tract east of Taylor Bayou along S. Broadway from Residential to <br />Commercial on the Future Land Use Plan. <br />• Retain the existing tract at the northeast corner of Wharton Weems Blvd. and SH 146 as <br />Commercial on the Future Land Use Plan. <br />• Correct any typos and incorrect references throughout the document. <br />Second by Commissioner Warren. Motion carried. <br />Ayes: Commissioners Warren, LaCour, Follis, Earp, Bird, and Chairman Lawler <br />Nays: Commissioner Hoot <br />Chairman Lawler thanked Kendig Keast Collaborative for their professionalism during this endeavor. <br />7. Administrative Reports <br />Tim Tietjens, Planning Director, reported City Council has directed a planning/procedural audit <br />of the Planning Department to ensure the City is being as responsive to our citizens as possible. <br />As part of the audit, Commission Members will more than likely be interviewed by the <br />consultant. It is anticipated the entire process should take approximately six (6) months. <br />8. Commission Comments on matters appearing on agenda or inquiry of staff regarding specific <br />factual information or existing policy. <br />Chairman Lawler thanked City staff for their contribution in working with the Commission to <br />review and update the Comprehensive Plan. <br />Commissioner Warren spoke of his appreciation for everyone working together and the time <br />dedicated to completing the Plan update. <br />Commissioner LaCour thanked the group. <br />Commissioner Follis stated he was proud of the final draft Plan and inquired about what would <br />be next for the Commission to review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.