My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-23-1994 Public Hearing and Regular Meeting ZBOA
LaPorte
>
City Secretary
>
Minutes
>
Zoning Board of Adjustment
>
1990's
>
1994
>
06-23-1994 Public Hearing and Regular Meeting ZBOA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2017 4:36:17 PM
Creation date
3/21/2025 3:09:27 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Zoning Board of Adjustments
Meeting Doc Type
Minutes
Date
6/23/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />713-690-0380 CRL DIVE INT'L. <br /> <br />360 P07/07 JUL 13'94 09:19 <br /> <br />City of LaPorte <br />June 15. 1994 <br />Page 3 <br /> <br />As a compromise option. I would like to position the new house 10' a.<.l a setback from the fence-- <br />line instead of the official lot line. This would still allow for the prescribed 5' setback from the <br />official lot line if at some point in the future, the road was purchased and built on. This <br />proposed position, given the no thoroughfare nature of the street and the status of the easement <br />as unused in my opinion, falls within the intent of the setback laws, lX'ses no inconvenience to <br />the community and preserves the character that the lot has had for some seventy years. given <br />. the hist..orie-positon of-the existing house, I feel that there is precOOent for- allowing the variance. <br /> <br />I will of course continue to try and provide the supporting documentation as mention.eid if I can <br />or as it is necessaty. However, it is my hope and my request that the City allow me to upgrade <br />the existing structure through replacement within the proposed plan that I have submitted. My <br />fiance and I will be married on July 30th and it is OUf hope to have the new house completed <br />as soon as possible. If there are any questions or anything that I need to do, please do not <br />hesitate to call me at any time at (713) 690-1818. I will phone you as we go along and provide <br />you with any updatea to the surveyor's te$:atCh results. <br /> <br />Best regards, <br /> <br />~4 <br /> <br />Owen Kratz <br /> <br />OKlrm <br />
The URL can be used to link to this page
Your browser does not support the video tag.