My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-23-95 Regular Meeing and Public Hearing
LaPorte
>
City Secretary
>
Minutes
>
Zoning Board of Adjustment
>
1990's
>
1995
>
03-23-95 Regular Meeing and Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2017 4:36:17 PM
Creation date
3/21/2025 3:09:30 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Zoning Board of Adjustments
Meeting Doc Type
Minutes
Date
3/23/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPLETI~S SECTION FOR ELECTRICAL PERM <br />NOTE: Minimum charge on permit(s) is 510.00. <br />Description •_ Charoes No. Fees <br />PERMIT ISSUE FEE S 5.00 1 S 5 <br />00 <br />Outlets, Fixtures,' Lights & Switches . <br />(first 9, flat fee) 2 <br />00 <br /> <br />Above Items (all others) . <br />.90 ea. g__ <br />g <br /> <br />Washing Machine <br />1.00 ea. _~ <br />g <br />Dryer / Range 2.00 ea. g <br />Cook Top / Oven / Fan _ <br />1.00 ea. g '- <br />Oven (commercial) 5 <br />00 <br /> <br />A/C, Plug-in Units . <br />ea. <br />2.00 ea. g <br />g ' <br />Water Heater 2.50 ea. g <br />Dishwasher / Garbage Disposal __ <br />1 <br />00 ea <br /> <br />All Services/Temp. Pole/Temp. Cut-In . <br />. <br />10.00 ea. g <br />g <br />All Meter Units <br />~ 5.00 ea. g <br />Reinspection Fee 10.00 ea. g <br />Re-Connection Fee 5.00 ea. g <br />X-Ray Machine 10.00 ea. g <br />Motion Picture Machine 3.00 ea. g <br />Incandescent Signs, cer circuit 4.00 ea. g <br />Gas or Vacuum Tube Signs(per transformer) 4.00 ea. g <br />Electric Welder 2.00 ea. g <br />MOTORS: <br />Up to but not including 1/2 hp 1.00 ea. g <br />1/2 hp and less than 2 hp 3.00 ea. g <br />2 hp and less than 10 hp 9.00 ea. g--- <br />10 hp and less than 25 hp 5.00 ea. g --' <br />25 hp and less than 100 hp 14 <br />00 <br /> <br />'100 hp and less than 150 hp . <br />ea. <br />1 <br />00 e g <br /> <br />150 hp and over, per hp . <br />a. <br />'.10 ea. g <br />g <br />Permanently connected electric a.pplican <br />otherwise specified sh <br />ll b ces'.and equipment of any nature not <br />a <br />e charged as follows: <br />Up to KW, inclusive 50 e <br /> <br />All over 1 KW to 10 KW . <br />a. <br />90 KW g <br />-- <br />All over 10 KW to 50 KW . <br />.30 KW g <br />g-- <br />All over 50 KW to 100 KW .20 KW g-"- <br />All over 100 KW S10.00 plus .40 KW g <br />--_ <br />___________________________ TOTAL FEE: g <br />COMPLETE THIS SECTION FOR PLUMBING PERMITS <br />Description Charoes No Fees <br />PERMIT ISSUING FEE $10 <br />00 <br /> <br />Plbq. Fixtures / Drains / Traps . <br />~_ <br />2 <br />50 g~0_ 00 <br /> <br />Sewer (new, repair or replacement) . <br />ea, <br />5 <br />00 ea g <br />_ <br />Cesspool ~ . <br />. <br />5.00 ea. g <br />g -- <br />Septic Tank / Seepage Pit.or Drainfield <br />W <br />t 10.00 ea. g <br /> <br />a <br />er Heater and/or Vent ~ <br />2.50 ea. _ <br />g <br />Gas Piping System (1-9 outlets) 5 <br />00 <br /> <br />Gas Outlets, over 4 •(each outlet) . <br />1.00 ea. g <br />g <br />Sprinkler, Lawn or Building - <br />(1-4 Heads) 5 <br />00 <br /> <br />(Over 4, each head) . <br />I.00 ea. g <br />g <br />Installation, Alteration or Repair of <br />Water Piping and/or Water <br />Treatment Equipment 5.00 ea. g <br />Repair/Alteration - Drainage or Vent 5.00 ea. g <br />Each Vacuum Breaker/Backflow Protection _ <br />Device Installed Subsequent to the <br />Installation of the Piping or <br />Equipment Served: <br />Each One (1-5) 2.50 ea. g <br />Each One (over 5) 1.50 ea. g <br /> TOTAL FEE g <br />~:. - ~•~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.