Laserfiche WebLink
Facts relevant to this matter <br /> I bought the property in May of 2010. <br /> A contactor widened and lengthened the driveway. <br /> The contractor built the driveway according to the driveway detail sheets. <br /> The detail sheets do not mention maximum coverage. <br /> The contractor did not obtain a permit from the city. <br /> If the contractor would have got a permit this would not have happened. <br /> I assume the responsibility of not getting a permit. <br /> The property has 56.1% coverage where 55% is the maximum allowed. <br /> Type of relief sought <br /> I am requesting to leave the 1.1% (75.9sf) concrete overage in place. <br /> Grounds for the request <br /> The excess coverage was not intentional. <br /> The excess is only 1.1% over the 55% maximum allowed. <br /> It would be expensive to saw cut and jackhammer out reinforced concrete. <br /> There are properties in the area with a higher % of coverage than mine. <br />