Laserfiche WebLink
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested: .Tuly 25, 2011 <br />Requested By: David Mick <br />Department: Public Works <br />ort: Resolution: Ordinance: <br />Exhibits: Background Data Including Request to <br />Exhibits: County, Deed, Plan Views, Title Summary <br />Appropriation <br />Source of Funds: Utility CIP <br />Account Numbe 003 <br />Amount Budgetecl� ��4�� �9* <br />Amount Requeste�: $l��r� <br />Budgeted item: N/A <br />Exhibits �OSt SPmmT���TeWS�P� �PP�- NPW Deed to City, New Deed to Harris County <br />Flood Control <br />* A Utility CIP account will be established in FY 11-12. There is an unused balance of $3,473.79 <br />remaining in account number 003-9890-612-7120 (Wastewater Equipment Replacement) that is <br />available for transfer into an account to be created for Lift Station 6. <br />SUMMARY & RECOMMENDATION <br />Reconstructing Lift Station #6, located at South 8 and West L Street, is a high priority capital <br />improvement proj ect for the City of La Porte. On January 14, 2008, City Council authorized $60,000 <br />for design. The design was completed in 2009. <br />Appro�mately two-thirds of the e�sting lift station is located in the South 8 Street right-of-way <br />and one-third is located on portions of two parcels that are owned by the Harris County Flood <br />Control District (HCFCD). The lift station is proposed to be expanded further into the county-owned <br />parcels. (Plan and aerial views are attached.) <br />In 2009, Steve Gillett, then Public Works Director, approached HCFCD and asked that the county <br />sell a 2,000-square feet (sf� easement to accommodate the expanded lift station. The county <br />preferred to sell the entire parcel, which would also necessitate a full appraisal, etc. Public Works <br />staff later suggested that the county consider trading the parcels needed for the City lift station for <br />two equivalent-sized parcels that are held by the City as trustee and located near the Harris County <br />parcels. The City does not yet have clear title to the property. <br />Obtaining clear title involves paying off the back taxes and associated fees that total $1696.75. Of <br />this amount, $358.59 comes back to the City of La Porte and $579.12 is paid to the La Porte ISD. (A <br />cost summary is attached.) <br />On the staff level, obtaining clear title is the last remaining county hurdle to navigate. Final approval <br />though rests with the County Commission Court in addition to City Council. <br />