My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-26-11 Regular Meeting of La Porte City Council
LaPorte
>
Agenda packets
>
City Council
>
2011
>
09-26-11 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2011 8:42:22 AM
Creation date
4/3/2025 3:01:25 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
9/26/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested: September 26, 2011 <br />Requested By: D Mi <br />Department: Public Works <br />Report: Resolution: Ordinance <br />Exhibits: December 13, 2010 agenda request <br />Exhibits: Back -un Data <br />Exhibits <br />Budget <br />Source of Funds: 049 <br />Account Number: 04998929435110 <br />Amount Budgeted S 81,096 <br />Amount Requested: S 125,223 <br />Budgeted Item: yes <br />SUMMARY & RECOMMENDATION <br />At the December 13, 2010 Council meeting, a contract with Matula and Matula construction <br />Company was approved to replace South 8th Street from Fairmont to Little Cedar Bayou Drive with <br />curb and gutter street and to replace the Golf course tunnel headwalls with SR type brick wall <br />system. The contract bid sheet was prepared so that all of the extra items for both projects are in one <br />section of the contract bid. <br />The construction is essentially complete with only a portion of the sod remaining to complete and <br />fence restoration. The total finds allocated for this contract was $606,509. The final cost is <br />projected to be just Under $550,000, or 11% less than the total finds allocated with the original total <br />amount authorized by city council. However, the sources for the finding should be revised. <br />Council will note that the final expenditure summary provided on the following page is revised from <br />the original contract request for the following reasons: <br />To move $26,000 in costs for golf course- related items that was inadvertently included with <br />the streets - related project cost in the original request. These costs include the contract line <br />item #'s 1 and 3 Under "Extra Work Items" for Sodding ($5000) and Dewatering ($13,450) <br />and an amount ($7,550) for soils testing; and <br />2. To address the cost over -run of approximately $18,127 on the golf course tunnel. This over - <br />run was primarily the result of a low bid quantity for the segmental block wall (an additional <br />$14,466 is required) and low contingency bid item for sodding (estimated cost to complete is <br />$9,000 total - $5,000 provided = $4,000 additional needed); and <br />3. To modify the budget to account for a cost savings on the 8 Street improvements, which <br />were the result of a field change designed to eliminate the need for much of the water line <br />relocation and Unused built -in contingency with the line item quantities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.