Laserfiche WebLink
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested: December 12, 2011 <br />Requested By: D Mi <br />Department: Public Works <br />Report: X Resolution: Ordinance <br />Exhibits: Bid Tabulation Base Bid Items <br />Exhibits: Unit Prices Bid _ Optional Bid Items <br />Bidder's List <br />Exhibits <br />Appropriation <br />Source of Funds: <br />Utility Fund <br />Account Number: <br />018 -9881- 669 -5120 <br />Amount Budgeted: <br />5210,000.00 <br />Amount Requested: <br />5176,037.50 <br />Budgeted Item: <br />Yes <br />SUMMARY & RECOMMENDATION <br />At the January 10, 2011 meeting, City Council formally adopted a 10 -year schedule of sewer system <br />improvements as part of the City's agreement with the Texas Commission on Environmental Quality <br />(TCEQ). The purpose of the City's agreement with TCEQ is to reduce the potential for sanitary <br />sewer system overflows that might occur during heavy rainfall events and /or long power outages. <br />The agreement is a continuation of the City's successful efforts over the last 20( +) -years that have <br />resulted in a significant reduction in the frequency of sewer overflows. <br />The City's sewer rehabilitation schedule includes - in part - sliplining at least 3,000 -feet of sewer <br />each year along with an additional quantity to be determined with the city's annual sewer smoke <br />testing and television inspection programs. The bidding contractors were asked to provide a unit <br />price for the bid base bid items identified on the attached spreadsheet along with "optional" bid items <br />that could be utilized throughout the year as- needed. <br />Advertised, sealed bids 912002 — Rehabilitation of Sanitary Sewer using Sliplining, Pipe Bursting and <br />Removal and Replace Techniques were opened and read November 1, 2 011. Bid requests were <br />advertised in the Houston Chronicle, posted on the City of La Porte website site and mailed out to six (6) <br />plan rooms and thirty-five (3 5) vendors with four (4) returning bids. <br />North Houston Pole Line, LP provided the lowest bid for the base bid items. And when compared to <br />the second -low bidder, North Houston Pole Line also provided the lowest or equal unit bid for <br />approximately 80% of the "optional" bid items. The optional bid items included with this contract <br />will provide a starting point for the Public Works Department's determination of the most <br />economical repair method and evaluation of this particular contractor as an option to perform the <br />work when a repair need is identified during the City's annual television inspection and smoke <br />testing programs. <br />Other Considerations: <br />This proposed contract is just one component of the City's annual program. The total FY 11 -12 <br />sanitary sewer rehabilitation budget is $345,000.00. <br />North Houston Pole Line successfully completed a very similar project for the City in 2009. <br />