Laserfiche WebLink
BID TABULATION <br />SEALED BID #92002 - REHABILITATION OF SANITARY SEWER USING <br />SLIPLINING, PIPE BURSTING AND REMOVE AND REPLACE TECHNIQUES <br />NORTH <br />HORSESHO <br />T CONSTR <br />PM CONSTR <br />DESCRIPTION <br />UNIT <br />QTY. <br />HOUSTON <br />E CONSTR <br />LLC <br />&REHAB <br />POLE LINE <br />INC <br />Base Bid Items: <br />1. Reconnection of Service Line 0' to 10' Deep <br />EA <br />115 <br />$300.00 <br />$350.00 <br />$420.00 <br />$400.00 <br />2. Sliplining 6" Diameter, 0' to 10' Deep <br />LF <br />2000 <br />$19.00 <br />$18.00 <br />$20.00 <br />$25.00 <br />3. Sliplining 8" Diameter, U to 10' Deep <br />LF <br />3500 <br />$21.00 <br />$20.00 <br />$22.00 <br />$27.00 <br />4. Obstruction Removal, 0' to 10' Deep <br />EA <br />6 <br />$300.00 <br />$100.00 <br />$300.00 <br />$325.00 <br />5. Trench Safety System, 0' to 10' Deep <br />LF <br />1150 <br />$1.25 <br />$1.00 <br />$1.00 <br />$1.00 <br />6. Install End of Line Cleanout w /Plug & Shoe <br />EA <br />6 <br />$300.00 <br />$1,850.00 <br />$600.00 <br />$850.00 <br />Base Bid Total <br />$151,037.50 <br />$159,100.00 <br />$171,850.00 <br />$198,700.00 <br />Amount Variance from Apparent Low Base Bid <br />$0.00 <br />($8,062.50) <br />($20,812.50) <br />($47,662.50) <br />Percent Variance from Apparent Low Base Bid <br />0.0% <br />-5.3% <br />-13.8% <br />-31.6% <br />Alternate Bid Item for Items #2 and #3 <br />7. Pipe Burst 6" & 8" Diameter, 0' to 10' Deep <br />LF <br />5500 <br />- Alternate Bid <br />Not Selected <br />