Laserfiche WebLink
percent plans unless there were additional changes which he has not seen and the changes were <br />forwarded to Senior Engineer Julian Garza. <br />Councilmember Zemanek asked what change took place to make the estimated project for the City <br />go from $400,000.00 to $578,000.00. Mr. Mick responded a couple of sanitary sewer extensionsin <br />conflict that were not noticed by either the City or the consultant for Harris County, and higher <br />bidding than anticipated. Councilmember Zemanek commented he is not opposed to the project, <br />but the City knew about it four months ago and now a Special Meeting is being proposed. <br />Councilmember Clausen commented it was a Harris County project, and the City was requested to <br />relocate the utilities in December. <br />Councilmember Engelken asked Councilmember Clausen how long Harris County hasbeen <br />holding the grant. Councilmember Clausen advised he did not know. <br />Mayor Rigby questionedPaskey bidding$.99 per square yard for removal of existing concrete <br />pavement on Section A (Waterline) of the Bid Tabulation and bidding$10.00 per square yard for <br />removal of existing concrete pavement onSection B (Sanitary Sewer). Public Works DirectorDave <br />Mick responded Paskey was not expecting to remove concretefor waterline installation and bid a <br />nominal amount, and there are too many constraints with setting the boring machine to install the <br />sanitary sewer system. <br />Councilmember Clausenmoved to go forward with the project.Councilmember Mosteitseconded. <br />MOTION FAILED. <br />Ayes: Mayor Rigby, Councilmembers Engelken, Mosteit, and <br />Clausen <br /> Nays: Councilmembers Moser, Kaminski, Zemanek and Leonard <br /> Absent:Councilmember Martin <br />Councilmember Zemanek moved to tablethis itemuntil a special meeting on April 1, 2013, as <br />MOTION <br />recommended by the Director of Public Works. Councilmember Leonard seconded. <br />PASSED. <br />Ayes: Mayor Rigby, Councilmembers Engelken, Mosteit, Clausen, <br />Moser, Zemanek, Leonard and Kaminski <br /> Nays: None <br /> Absent:Councilmember Martin <br />(b) <br />Consider approval or other action awarding Bid #13014 for Wave Pool Mechanical Building <br />Renovation – S. Barr <br />Parks and Recreation DirectorStephen Barrpresented a summary. <br />Councilmember Engelken asked why is there a delayto just now doing the project with the summer <br />coming on. Parks and Recreation Director Barr advised additional issues were discovered after the <br />engineer’s assessment. <br />Mayor Rigby questioned if the bid from Aztec meetsthe scope of work. Mr.Barr responded yes. <br />Councilmember Moser questioned if the building could be utilized an additional year. Mr. Barr <br />responded the building has severe structural issues. <br />Page 3 of 6 <br />March 25, 2013, City Council Meeting Minutes <br /> <br />