My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-22-13 Regular Meeting of La Porte City Council
LaPorte
>
Agenda packets
>
City Council
>
2013
>
07-22-13 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2013 8:42:15 AM
Creation date
4/3/2025 3:06:46 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
7/22/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Other Considerations: <br />The Hillridge/Roseberry repairs will include an improved vertical profile through the <br />intersection. <br />The original $250,000 budget for this work was reduced by $18,100.00 to fund concrete repair <br />on the city-maintained portion of Farrington Boulevard just north of Spencer Highway. <br />Contract and city forces were utilized to complete the Farrington Boulevard repairs last month to <br />take advantage of the traffic control that is now in place for the Pct. 2 improvements south of <br />Spencer Highway. <br />Locations of repairs completed by cityforces this FY (1500 SY)are provided below. An <br />additional 700 SY is scheduled for completion by city forces this current year (not part of this <br />contract). <br />Collingdale at Fern RockRustic Gate at Roseberry <br />3207 Fern Rock3307 Fern Rock <br />3311 Fern RockLift Sta #31-Cottonwood <br />8523 Ashwyne3527 Rustic Gate <br />10907 Pecan3603 Rustic Gate <br />3800 Pecan3519 Rustic Gate <br />Farrington (N. of Spencer)10118 Shellrock <br />Myrtle Creek at Willow Creek9807 Charmont <br />Rustic Gate at Oakmont <br />Action Requested of Council: <br />Consider approval or other action to award Bid # 13020Annual Concrete Street, Drainage, and <br />Sidewalk Repair Contract to Brooks Concrete, Inc. in the amount of $116,517.00 for the Base Bid <br />plus Alternate #1(Hillridge/Roseberry)only,plus a $11,483.00 contingency for a total expenditure <br />of $128,000.00 <br />Approved for City Council Agenda <br />Corby D. Alexander,CityManagerDate <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.