My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-23-16 Regular Meeting of the La Porte City Council
LaPorte
>
Agenda packets
>
City Council
>
2016
>
05-23-16 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 11:27:04 AM
Creation date
4/3/2025 3:14:12 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
5/23/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEMREQUEST FOR CITY COUNCIL AGENDA ITEM <br />May 23, 2016May 23, 2016AppropriationAppropriation <br />Agenda Date Requested:Agenda Date Requested: <br />033033 <br />Sharon ValianteSharon ValianteSource of Funds:Source of Funds: <br />Requested By:Requested By: <br />033.9892.886.1100033.9892.886.1100 <br />Public WorksPublic WorksAccount Number:Account Number: <br />Department:Department: <br />$1,000,000$1,000,000 <br />Amount Budgeted:Amount Budgeted: <br />Report:Resolution:Resolution:Ordinance:Ordinance: <br />Amount Amount <br />Other: <br />$643,179$643,179 <br />Requested:Requested: <br />AttachmentsAttachments : : <br />Budgeted Item:Budgeted Item:YESYESNONO <br />1. Bid Tabulation Bid Tabulation <br />2. Map and Resurfacing Plan Map and Resurfacing Plan <br />3. Vendor Acess Report Vendor Acess Report <br />SUMMARY & RECOMMENDATIONSSUMMARY & RECOMMENDATIONS <br />Advertised, sealed bid proposals for La Porte FY 2016 Street Overlay were opened and read on April 26, Advertised, sealed bid proposals for La Porte FY 2016 Street Overlay were opened <br /> and read on April 26, <br />2016. Bid requests were advertised in the Bay Area Observer, posted on the City of La Porte website 2016. Bid requests were advertised in the Bay Area Observer, posted on the City of <br /> La Porte website <br />site and Public Purchase with six (6) contractors returning bids. site and Public Purchase with six (6) contractors returning bids. <br />Forde Construction submitted the lowest bid in the amount of $584,778.60 for the Base Bid. Staff Forde Construction submitted the lowest bid in the amount of $584,778.60 for the Base <br /> Bid. Staff <br />recommends that the project be awarded to Forde Construction in the amount of $584,778.60 with a recommends that the project be awarded to Forde Construction in the amount of $584,778.60 <br /> with a <br />total authorization of $643,179, which includes a 10% project contingency. total authorization of $643,179, which includes a 10% project contingency. <br />Type D Asphalt price went down 4% from FY 14 to FY 16. Type D Asphalt price went down 4% from FY 14 to FY 16. <br />Project Benefits, Liabilities, and Operating Cost: Project Benefits, Liabilities, and Operating Cost: Project Benefits, Liabilities, and Operating Cost: Project Benefits, Liabilities, <br /> and Operating Cost: <br />Benefits: <br />The proposed project provides maintenance and rehabilitation of existing public facilities The proposed project provides maintenance and rehabilitation of existing public facilities <br /> <br />anticipated by the residents with the street tax renewal. anticipated by the residents with the street tax renewal. <br />Liabilities of Maintaining the Status Quo:Liabilities of Maintaining the Status Quo: <br />The scope and cost of the proposed work would likely increase if the proposed resurfacing work The scope and cost of the proposed work would likely increase if the proposed resurfacing <br /> work <br />is deferred for an extended period of time. is deferred for an extended period of time. <br />Operating Costs:Operating Costs: <br />No new facilities will be added with this project. No new facilities will be added with this project. <br />Other Considerations: Other Considerations: <br />Staff plans to also surface the North C Street ROW and adjacent area of the fire training facility Staff plans to also surface the North C Street ROW and adjacent area of the fire training <br /> facility <br />with this project. with this project. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.