My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-14-16 Regular Meeting of the La Porte City Council
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
City Council
>
City Council
>
City Council Meetings
>
2016
>
11-14-16 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2016 4:26:57 PM
Creation date
4/3/2025 3:15:38 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
11/14/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />prepare and submit all final drawings, plans, cost estimates and specifications for the Project. La <br />Porte shall be responsible for incorporating into the bid specifications any and all FTA and any <br />and all County Harris County Community Services Department <br />Exhibit C. <br /> <br />La Porte shall ensure that the specifications require the Contractor/Subcontractors to furnish <br /> Insurance pursuant to the laws <br />of the State of Texas, and Payment Bond and Performance Bond pursuant to the applicable <br />sections of OMB Super Circular 2 CFR Part 200. <br /> <br />Once approved, the complete set of drawings, plans, cost estimates and specifications shall be <br />incorporated into this Agreement as part of Exhibit A. <br /> <br />2. Temporary Project Sign and Workspace <br /> <br />La Porte shall ensure that the specifications include the delivery and installation by contractor of <br />--County requirements. La Porte shall ensure <br />that the cost of the sign is included in all bids. La Porte shall ensure that the specifications <br />require the Contractor to furnish adequate workspace at the construction site for County <br />inspection and monitoring staff, if applicable. <br /> <br />3. Bidding and Selection of Contractor and Subcontractors <br /> <br />La Porte agrees and understands that all contracted and subcontracted construction activity <br />carried out under this Agreement shall be selected and executed pursuant to federal procurement <br />regulations set in OMB Super Circular 2 CFR Part 200 and to County policy and procurement <br />guidelines. <br /> <br />After the CountyLa Porte <br />shall advertise for and receive bids for the construction of the Project in accordance with <br />approved drawings and specifications which bidding procedure shall be in accordance with this <br />Agreement. <br /> <br />Upon receipt and tabulation of the bids for the Project, La Porte shall determine the lowest and <br />most responsible bidder for the construction of the Project. Within fifteen (15) days after receipt <br />of bids, La Porte shall forward, or cause to forward, to the County, copies of all bids received, <br />copy of all bid bonds, and bid tabulation for the County. The County <br />reserves the right to approve the award of the bid. In the event the lowest and most responsible <br />bid for the construction of the Project is an amount that would result in the total cost of the <br />Project being equal to or less than the sum allocated in the construction line item of the budget, <br />detailed in Exhibit B of this Agreement, La Porte shall notify the County of the amount of the <br />lowest and most responsible bid for the Project. <br /> <br /> Page 3 of 58 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.