REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested:March 13, 2017 Appropriation: <br />Requested By: Traci Leach Source of Funds: 015 <br />Department: Administration Account Number: <br />Report: __ __Resolution: _____Ordinance: _ _Amount Budgeted: $75,000 <br />Exhibits: Approved Monument Design Amount Requested: $55,820.60 <br />Bid Tabulation <br /> Public purchase Access report Budgeted Item: Yes <br />_____________________________________________________________________________________ <br />SUMMARY & RECOMMENDATION <br />In the FY16 budget, the City partnered with TXDOT to beautify the median entryway at Wharton <br />Weems Blvd and SH146. TXDOT is currently underway on the construction of its portion of the <br />project- removal of existing concrete, installation of pavers, and installation of irrigation and <br />landscaping. The TXDOT work will occur in two time frames, with the demolition work happening <br />now and the landscape and paver work occurring once the City’s portion of the project is completed. <br />The City included $75,000 in the CIP to construct an entryway monument. The City engaged an <br />architectural design firm, Knudson LP, to create several design concepts for Council consideration <br />and Council selected Design Option 3 at the May 2016 Council meeting. Estimated construction <br />budget available at this time is approximately $56,000. <br />Bid No. 16023 was advertised in the Bay Area Observer on August 25 and September 1, with a bid <br />opening on September 13, 2016. These bids were over budget and Council directed staff to value <br />engineer and re-bid the project. Staff reviewed the bid specifications and made several <br />modifications that were believed to assist in bringing the construction costs within the remaining <br />construction budget. The changes included eliminating all cast stone veneer and changing the <br />lighting from six (6) to four (4). Neither modification will impact the how the monument looks, but <br />were more economical to construct. <br />The re-bid was advertised on January 26, 2017 and February 2, 2017. Bids were opened and publicly <br />read on February 16, 2017. One hundred forty-five vendors were notified with thirty three accessing <br />the bid and twenty three downloading the bid documents. Five vendors responded. The lowest <br />qualified bid was submitted by Capital Signs in the amount of $50,746. While this bid was <br />substantially lower than the other bids, staff vetted the submittal and determined that all requirements <br />were met. Capital Signs had positive reference checks. <br />Staff recommends awarding Bid No. 17011 for the construction of the Wharton Weems entryway <br />monument to Capital Signs in the amount of $50,746, plus a 10% contingency amount for a total <br />project budget of 55,820.60. <br />Action Required by Council: <br />Consider approval or other action to award Bid No. 17011 to Capital Signs in the amount of <br />$55,820.60 for the construction of the Wharton Weems entryway monument. <br />Approved for City Council Agenda <br />___________________________________ _______________________ <br />Corby D. Alexander, City Manager Date <br /> <br />