BIDTABULATION
<br />BID#17016HEADSTARTFACILITYPARKINGIMPROVEMENTSREBID
<br />DUE:APRIL25,2017AT2:00P.M.
<br />CORESTONECONSTUCTION
<br />AZTECREMODELINGAND
<br />SERVICES
<br />AAAASPHALTPAVINGINC.LANDSCAPINGCO.
<br />Item
<br />No.
<br />GeneralItems QtyUnitUnitPriceTotalPriceUnitPriceTotalPriceUnitPriceTotalPrice
<br />1Mobilization1LumpSum$5,500.00$5,500.00$5,000.00$5,000.00$8,000.00$8,000.00
<br />2TrafficControlandRegulation1LumpSum$8,250.00$8,250.00$1,500.00$1,500.00$1,500.00$1,500.00
<br />3Sodding250SY$9.70$2,425.00$5.50$1,375.00$4.00$1,000.00
<br />GeneralItemsSubtotal$16,175.00$7,875.00$10,500.00
<br />ExistingParkingAreaItems
<br />4ThermoplasticPavementMarkingsRegularParkingSpace(11
<br />)1LumpSum$1,687.00$1,687.00$210.00$210.00$600.00$600.00
<br />)1LumpSum$1,234.00$1,234.00$350.00$350.00$800.00$800.00
<br />5ThermoplasticPavementMarkingsRegularADA/HcapSpace(2
<br />)1LumpSum$235.00$235.00$350.00$350.00$400.00$400.00
<br />6ThermoplasticPavementMarkingsVanADA/HcapSpace(1
<br />ExistingParkingAreaItemsSubtotal$3,156.00$910.00$1,800.00
<br />ParkingArea1Items
<br />t258SY$75.80$19,556.40$55.00$14,190.00$64.00$16,512.00
<br />76"ConcretePavemen
<br />84"CementStabilizedSand(CSS)50Tons$290.00$14,500.00$75.00$3,750.00$70.00$3,500.00
<br />r2EA$2,325.00$4,650.00$750.00$1,500.00$750.00$1,500.00
<br />9ConcreteColla
<br />)1EA$2,379.00$2,379.00$1,850.00$1,850.00$1,000.00$1,000.00
<br />10AInlet(modifiedcollarperdetail
<br />11StormSewer18"RCP111LF$68.20$7,570.20$75.00$8,325.00$60.00$6,660.00
<br />)1LumpSum$2,170.00$2,170.00$190.00$190.00$500.00$500.00
<br />12ThermoplasticPavementMarkingsRegularParkingSpace(10
<br />ParkingArea1ItemsSubtotal$50,825.60$29,805.00$29,672.00
<br />ParkingArea2Items
<br />t48Tons$264.00$12,672.00$225.00$10,800.00$180.00$8,640.00
<br />133"AsphaltPavemen
<br />1410"RecycledCrushedCon.Base(RCCB)142Tons$275.00$39,050.00$45.00$6,390.00$65.00$9,230.00
<br />15Lime6"Treatment(8%)7Tons$225.00$1,575.00$225.00$1,575.00$230.00$1,610.00
<br />n284SY$47.70$13,546.80$15.00$4,260.00$11.00$3,124.00
<br />166"LimeStabilizatio
<br />r2EA$3,325.00$6,650.00$750.00$1,500.00$750.00$1,500.00
<br />17ConcreteColla
<br />)1EA$2,379.50$2,379.50$1,850.00$1,850.00$1,000.00$1,000.00
<br />18AInlet(modifiedcollarperdetail
<br />19StormSewer18"RCP134LF$68.20$9,138.80$75.00$10,050.00$60.00$8,040.00
<br />)1LumpSum$1,404.00$1,404.00$225.00$225.00$600.00$600.00
<br />20ThermoplasticPavementMarkingsRegularParkingSpace(12
<br />ParkingArea2Subtotal$86,416.10$36,650.00$33,744.00
<br />ParkingArea3Items
<br />t19Tons$264.00$5,016.00$425.00$8,075.00$180.00$3,420.00
<br />213"AsphaltPavemen
<br />2210"RecycledCrushedCon.Base(RCCB)57Tons$275.00$15,675.00$45.00$2,565.00$65.00$3,705.00
<br />23Lime6"Treatment(8%)3Tons$225.00$675.00$225.00$675.00$230.00$690.00
<br />n114SY$47.70$5,437.80$25.00$2,850.00$11.00$1,254.00
<br />246"LimeStabilizatio
<br />r1EA$3,325.00$3,325.00$750.00$750.00$750.00$750.00
<br />25ConcreteColla
<br />26StormSewer18"RCP60LF$68.20$4,092.00$75.00$4,500.00$60.00$3,600.00
<br />)1LumpSum$579.00$579.00$95.00$95.00$300.00$300.00
<br />27ThermoplasticPavementMarkingsRegularParkingSpace(5
<br />ParkingArea3Subtotal$34,799.80$19,510.00$13,719.00
<br />BASEBIDTOTAL
<br />$191,372.50$94,750.00$89,435.00
<br />Item
<br />ItemDescriptionQtyUnitUnitPriceTotalPriceUnitPriceTotalPriceUnitPriceTotalPrice
<br />No.
<br />ALTERNATEBIDITEMS(PRICEMUSTMATCHBASEBIDVIAITEMNO.)
<br />PARKINGAREA1ITEMS
<br />9(DEDUCT)ConcreteCollar2EA$3,325.00$6,650.00$650.00$1,300.00$750.00$1,500.00
<br />)1EA$2,379.00$1,250.00$1,250.00$1,000.00$1,000.00
<br />10(DEDUCT)AInlet(modifiedcollarperdetail$2,379.00
<br />11(DEDUCT)StormSewer18"RCP111LF$68.20$55.00$6,105.00$60.00$6,660.00
<br />$7,570.20
<br />ParkingArea1Subtotal$16,599.20$8,655.00$9,160.00
<br />PARKINGAREA2ITEMS
<br />17(DEDUCT)ConcreteCollar2EA$3,325.00$6,650.00$650.00$1,300.00$750.00$1,500.00
<br />)1EA$2,379.00$1,250.00$1,250.00$1,000.00$1,000.00
<br />18(DEDUCT)AInlet(modifiedcollarperdetail$2,379.00
<br />19(DEDUCT)StormSewer18"RCP134LF$68.20$9,138.80$55.00$7,370.00$60.00$8,040.00
<br />ParkingArea3Subtotal$18,167.80$9,920.00$10,540.00
<br />PARKINGAREA3ITEMS
<br />25(DEDUCT)ConcreteCollar1EA$3,325.00$3,325.00$650.00$650.00$750.00$750.00
<br />26(DEDUCT)StormSewer18"RCP60LF$68.20$4,092.00$55.00$3,300.00$60.00$3,600.00
<br />ParkingArea4Subtotal$7,417.00$3,950.00$4,350.00
<br />ALTBIDDEDUCTTOTAL$42,184.00$22,525.00$24,050.00
<br />$149,188.50$72,225.00$65,385.00
<br />ALTBIDTOTAL(BASEBIDMINUSALTBIDDEDUCT)
<br />m
<br />MathematicalerroronBidFor
<br />Bidtabulationispreliminaryanddoesnotimplyanytypeofaward.Otherfactorsmayapply
<br />
<br />
|