My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-22-17 Regular Meeting of the La Porte City Council
LaPorte
>
Agenda Packets
>
City Council
>
2017
>
05-22-17 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2017 11:13:32 AM
Creation date
4/3/2025 3:16:53 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
5/22/2017
Sticky Note
ID:
1
Text:
Tabled. Coming back Council meeting June 12, 2017
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Budget <br />Agenda Date Requested: May 22, 2017 <br />Source of Funds: 015, 051 <br />Requested By: Don Pennell <br />Account Number: 015-7070-530-1100 <br />Department: Public Works <br /> 051-7071-531-1100 <br />Report: Resolution: Ordinance: <br />Amount Budgeted: 15 $350,000 <br /> 51 $150,000 <br />Exhibit: Binkley & Barfield Professional Services Proposal <br />Amount Requested: 15 $50,000 <br /> 51 $150,000 <br />Budgeted Item: YES /NO <br />SUMMARY & RECOMMENDATION <br />Somerton/Venture: <br />The FY 16 budget includes an allocation for the design of Somerton infrastructure improvements <br />which includes replacing existing waterline and pavement from the Bandridge Water Plant to <br />Spencer Highway. The existing waterline is an 8 inch asbestos cement waterline that is identified <br />for upsizing to a 12 inch PVC waterline in the 2009 Water Master Plan. The Venture waterline <br />will create an additional loop in the water system also identified in the 2009 Water Master Plan. <br />The Somerton pavement rating in the 2013 assessment was rated at 40 percent replacement. The <br />pavement was crack sealed at the time to extend the life of the pavement. <br />Pecan Park: <br />The FY 16 budget includes an allocation for the design of additional parking spaces at Pecan <br />Park. This project includes the installation of approximately 123 additional parking spaces at <br />Pecan Park. The proposed spaces will be located in the northeast corner of the park and infill <br />spaces at locations underutilized. <br />Recommendation: <br />An evaluation team evaluated the following firms’ Statement(s) of Qualifications: <br />RPS Klotz Assoc. Cobb, Fendley & Associates, HDR Engineering, Inc. <br />Inc. <br />Amani Engineering, Inc. IDCUS Inc. <br />Dannenbaum Engineering <br />Binkley & Barfield, Inc. Kit Professionals, Inc. <br />Corporation <br />Bleyl Engineering, McDonough Engineering <br />DIG Engineers <br />Inc.Corporation <br />Freese and Nichols <br />CivilTech Engineering, R.G. Miller Engineers, Inc. <br />Inc.GC Engineering, Inc. <br />Terra Associates, Inc. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.