Laserfiche WebLink
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Appropriation <br />Agenda Date Requested February 12, 2018 <br />Source of Funds:015 <br />Requested By:Don Pennell <br />Account Number:015.9090.519.1100 <br />Department:Public Works <br />Amount Budgeted:$286,000.00 <br />ReportXResolution:Ordinance: <br />Amount Requested: $254,373.93 <br />Exhibit:Harris County Interlocal Agreement <br />Budgeted Item:YESNO <br />Exhibit: Exhibit A-Project Location Map <br />Exhibit: Access Report <br />Exhibit: Bid Tab <br />Exhibit: Bid Form <br />Exhibit: Engineer’s Recommendation <br />SUMMARY & RECOMMENDATION <br />On September 12, 2011, Council authorized execution of a contract with for Klotz Associates, Inc. for the analysis <br />flooding within Battleground Estates. A hydraulic model was developed to reflect existing conditions along the <br />F101 Channel which serves as an outfall for drainage from the Battleground Estates Addition. The model indicated <br />that flows within segments of the F101 Channel, north of North ‘P’ Street, rise to a level creating capacity <br />limitations which produce frequent out of banks occurrences. <br />The unimproved upstream channel flows into two forty-two inch (42”) corrugated metal pipes (CMP), which feed <br />into the improved two 8’ x 10’ reinforced concrete boxes downstream. The difference in upstream and downstream <br />conveyance areas creates a restriction upstream, leading to the increase water levels within the northern section of <br />the channel. <br />LJA Engineering, Inc. provided Engineering Design Services (FY 12-13) for the recommended improvements of <br />removing the two upstream forty-two inch (42”) corrugated metal pipes and extending the dual 8’ x 10’ reinforced <br />concrete boxes across North ‘P’ Street. <br />The remaining construction budget includes an allocation of $201,000.00 for proposed construction improvements. <br />The City has entered into an Inter-local Agreement with Harris County (approved by Council on 11/13/17; approved <br />by the County on 12/05/17) allowing the City to becomeentitled to a total maximum compensation of $85,000.00, <br />from Harris County, for the construction of drainage improvements, allowing for a total construction budget of <br />$286,000.00. <br />Bid # 18006 for the North P Street Culvert Extension Project was opened andread on December 20, 2017. The bid <br />was advertised in the Bay Area Observer on November 30 and December 7, 2017, and posted on Public Purchase <br />and the City's website. Thirty-two (32) vendors accessed the bid and five (5) bids were received. Paskey Inc. <br />submitted the lowest and best total bid at $231,373.93. <br />Benefits: <br />Provides improved drainage conveyance within the F101 Channel, across NorthP Street. <br />Liabilities: <br />Capacity limitations and out of banks occurrences would remain. <br />Operating Costs: <br />N/A <br />Action Required by Council: <br /> <br />