Laserfiche WebLink
1 of 1 <br /> <br />4,500.006,000.002,000.008,100.00 <br /> <br /> <br />59,000.0025,000.0034,037.0049,000.0011,400.0018,560.0045,000.0010,100.0025,000.0024,500.0049,500.0010,100.0049,500.00 <br /> <br />429,077.00398,000.00224,000.00389,000.00 <br />TOTAL <br /> <br />1,692,574.001,692,574.001,752,174.00 <br />AMOUNT <br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ <br /> <br />$ $ $ $ $ $ $ <br />City of La Porte, Texas <br />Resicom <br /> <br />20.00 <br /> <br />128.00 <br /> <br />4,500.006,000.008,100.00 <br />UNIT <br /> <br />59,000.0025,000.0034,037.0049,000.0011,400.0045,000.0025,000.0024,500.00 <br />PRICE <br /> <br />429,077.00398,000.00224,000.00389,000.00 <br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ <br /> <br />3,480.006,000.002,000.008,700.00 <br /> <br /> <br />61,200.0048,600.0036,100.0047,800.0085,700.0037,100.0019,900.0024,600.0010,700.0025,000.0024,500.0049,500.0010,700.0049,500.00 <br /> <br />380,500.00105,000.00333,900.00 <br />TOTAL <br /> <br />1,189,880.001,189,880.001,250,080.00 <br />AMOUNT <br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ <br /> <br />$ $ $ $ $ $ $ <br /> <br />24.0020.00 <br /> <br />6,000.008,700.00 <br />UNIT <br /> <br />61,200.0048,600.0036,100.0047,800.0085,700.0037,100.0019,900.0024,600.0025,000.0024,500.00 <br />PRICE <br /> <br />380,500.00105,000.00333,900.00 <br />Black Castle General Contractors <br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ <br /> <br /> <br />8,132.005,528.005,036.003,920.005,465.009,385.009,385.00 <br /> <br /> <br />55,667.0021,245.0020,391.0052,402.0013,811.0031,900.0027,777.0025,000.0024,500.0049,500.0049,500.00 <br /> <br />433,528.00132,288.00302,309.00 <br />TOTAL <br /> <br />1,110,014.001,110,014.001,168,899.00 <br />AMOUNT <br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ <br /> <br />$ $ $ $ $ $ $ <br /> <br />39.20 <br /> <br />220.00 <br /> <br />8,132.005,528.005,036.005,465.00 <br /> <br />55,667.0021,245.0020,391.0052,402.0013,811.0027,777.0025,000.0024,500.00 <br /> <br />UNIT <br />433,528.00132,288.00302,309.00 <br />B5 Construction Company <br />PRICE <br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ <br /> $ <br /> <br />5,000.007,000.005,000.004,000.006,000.00 <br /> <br /> <br />50,000.0050,000.0025,000.0020,000.0075,000.0014,500.0014,000.0010,000.0025,000.0024,500.0049,500.0010,000.0049,500.00 <br /> <br />337,500.00150,000.00300,000.00 <br />TOTAL <br /> <br />1,053,000.001,053,000.001,112,500.00 <br />AMOUNT <br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ <br /> <br />$ $ $ $ $ $ $ <br /> <br />40.00 <br /> <br />100.00 <br /> <br />5,000.007,000.005,000.006,000.00 <br />UNIT <br /> <br />50,000.0050,000.0025,000.0020,000.0075,000.0014,000.0025,000.0024,500.00 <br />PRICE <br />Sustanite Support Services <br /> <br />337,500.00150,000.00300,000.00 <br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ <br /> <br /> <br />7,000.001,000.005,000.002,000.006,000.008,000.008,000.00 <br /> <br /> <br />50,000.0010,000.0017,000.0040,000.0040,000.0010,000.0010,875.0025,000.0025,000.0024,500.0049,500.0049,500.00 <br /> <br />530,000.00300,000.00 <br />TOTAL <br /> <br />1,045,875.001,045,875.001,103,375.00 <br />AMOUNT <br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ <br /> $ <br />$ $ $ $ $ $ $ <br />R & B Group <br /> <br />75.0020.00 <br /> <br />7,000.001,000.005,000.006,000.00 <br />UNIT <br /> <br />50,000.0010,000.0017,000.0040,000.0040,000.0010,000.0025,000.0025,000.0024,500.00 <br />PRICE <br /> <br />530,000.00300,000.00 <br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ <br />Hillridge Water Plant Improvements - Phase II Project <br /> <br /> <br />5,000.002,000.006,000.005,250.002,000.007,500.009,500.009,500.00 <br /> <br /> <br />40,000.0030,000.0040,000.0060,000.0030,000.0021,750.0030,000.0025,000.0024,500.0049,500.0049,500.00 <br /> <br />375,000.00371,000.00 <br />TOTAL <br /> <br />1,016,000.001,016,000.001,075,000.00 <br />AMOUNT <br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ <br /> $ <br />$ $ $ $ $ $ $ <br /> <br />20.00 <br /> <br />150.00 <br /> <br />5,000.002,000.006,000.005,250.007,500.00 <br />UNIT <br />W.W. Payton Corporation <br /> <br />40,000.0030,000.0040,000.0060,000.0030,000.0030,000.0025,000.0024,500.00 <br />PRICE <br /> <br />375,000.00371,000.00 <br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ <br />111111111111111 <br />145100 <br />QUAN. <br />EA. <br />L.S.L.S.L.S.L.S.L.S.L.S.L.S.L.S.L.S.L.S.L.S.L.S. <br />S.Y. <br />C.Y.C.A.C.A. <br />UNIT <br />inin <br />or <br />per <br />floor <br />Building, <br />head), <br />structural, <br />completerequipment, <br />described <br />handrails, <br />120-ft <br />and <br />programming <br />and <br />@ <br />Concrete <br />sodding, <br />architectural, <br />Room <br />backfill, <br />plans <br />gpm <br />or <br />TOTAL BID (A + B + C): <br />controller <br />on <br />Precast <br />and <br />MCC <br />for <br />TOTAL BASE BID ITEMS (A):TOTAL BASE BID ITEMS (A): <br />(1,000 <br />seeding <br />associatedshown <br />Station <br />bedding <br />all <br />bollards, <br />Pumps <br />TOTAL CASH ALLOWANCE ITEMS (C):TOTAL CASH ALLOWANCE ITEMS (C): <br />grading, <br />"allowance" <br />and <br />TOTAL SUPPLEMENTAL BID ITEMS (B):TOTAL SUPPLEMENTAL BID ITEMS (B): <br />pipe <br />an <br />Booster <br />Booster <br />foundation, <br />ITEM DESCRIPTION <br />appurtenances <br />SF) <br />stripping, <br />to <br />Include <br />Case <br />sidewalk,equipment, <br />site <br />and <br />(1,000 <br />Split <br />roof, <br />limited <br />electrical <br />not <br />room <br />line, <br />and <br />including <br />50'x20' <br />Programming: <br />but <br />feedHorizontal <br />drain <br />(1) <br />Work, <br />Mobilization, complete in place, the sum of: (5% maximum)Siteplace, the sum of:Constructincludingdrains,chlorinemechanical,specifications, complete in place, the sum of:Oneequivalent, <br /> complete in place, the sum of:Two (2) Horizontal Split Case Booster Pumps, (650 gpm @120-ft Head), or equivalent, complete in place, the sum of:Station Piping to include all booster <br /> pump suction and discharge header piping as identified on the plans, including valves, fittings, and any requirements for proper operation of the plant as shown on plans and as described <br /> in the specifications, complete in place, the sum of:Yard Piping to include all onsite water mains and drain lines outside booster station building as identified on the plans, including <br /> proposed flanged connection to Ground Storage Tank, valves, fittings, wet connections, drain lines connection to downspouts and grate inlet, and any trench safety requirements as shown <br /> on plans and as described in specifications, complete in place, the sum of:Removal of bends, abandonment of water lines and suction lines, and instlalation of blind flanges as shown <br /> on plans and as described in specifications, complete ni place, the sum of:Wet connection to existing 12" water line, including two 12" gate valves and boxes, as shown on plans and <br /> as described in specifications, complete in place, the sum of:Remove and replace 6" thick concrete pavement and driveway, including sawcutting, subgrade, reinforcement and joints, complete <br /> in place, the sum of:Remove and replace existing 8-ft chain link fence, install double 8-ft wide swing access gate and pedestrian gate as shown on plans and as described in specifications, <br /> complete in place, the sum of:Chlorine disinfection system, including but not limited to, scale for 150# chlorine cylinder, gas chlorinators, automatic switchovers, injectors, solenoid <br /> valves and bypasses, gas sensors and alarms, wall-mounted self-contained breathing apparatus, high pressure booster pump, piping, feed lines, 1" schedule 80 PVC injection line, pipe <br /> connections, chlorine injection manhole, electrical, and all other items as shown on plans and as described in specifications for a complete and operational chlorine disinfection system, <br /> complete in place, the sum of:Electrical System Installation: Provide and install all work shown on the plans and described in specifications including as follows: provide and install <br /> motor control center, lighting and receptacles, pump motor feeders and terminal boxes, electrical service equipment, autosensory controls, generator quick connect, and all required <br /> appurtenances as shown on plans and as described in specifications for a complete operating system, complete in place, the sum of:Install extra cement stabilized sand12"x12" TS&V, complete <br /> in place, the sum of:Electrical Service: Include an "Allowance" for electrical service by the local Electrical Service Provider. Exact amount will be reimbursed to Contractor upon submittal <br /> of invoice from Electrical Service Provider for a lump sum of:ControllerSection 16-904 - "Controller," for a lump sum of:Represents Error Corrected by Engineer <br />123456789 <br />101112131415 <br />NO. <br />CA-1CA-2 <br />ITEM <br />A. BASE BID ITEMS:B. SUPPLEMENTAL BID ITEMS:C. CASH ALLOWANCE ITEMS: <br />City Bid #19015HDR Job No. 19-014Bid Date 6/25/19 <br /> <br />