1 of 1
<br />
<br />4,500.006,000.002,000.008,100.00
<br />
<br />
<br />59,000.0025,000.0034,037.0049,000.0011,400.0018,560.0045,000.0010,100.0025,000.0024,500.0049,500.0010,100.0049,500.00
<br />
<br />429,077.00398,000.00224,000.00389,000.00
<br />TOTAL
<br />
<br />1,692,574.001,692,574.001,752,174.00
<br />AMOUNT
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br />
<br />$ $ $ $ $ $ $
<br />City of La Porte, Texas
<br />Resicom
<br />
<br />20.00
<br />
<br />128.00
<br />
<br />4,500.006,000.008,100.00
<br />UNIT
<br />
<br />59,000.0025,000.0034,037.0049,000.0011,400.0045,000.0025,000.0024,500.00
<br />PRICE
<br />
<br />429,077.00398,000.00224,000.00389,000.00
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br />
<br />3,480.006,000.002,000.008,700.00
<br />
<br />
<br />61,200.0048,600.0036,100.0047,800.0085,700.0037,100.0019,900.0024,600.0010,700.0025,000.0024,500.0049,500.0010,700.0049,500.00
<br />
<br />380,500.00105,000.00333,900.00
<br />TOTAL
<br />
<br />1,189,880.001,189,880.001,250,080.00
<br />AMOUNT
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br />
<br />$ $ $ $ $ $ $
<br />
<br />24.0020.00
<br />
<br />6,000.008,700.00
<br />UNIT
<br />
<br />61,200.0048,600.0036,100.0047,800.0085,700.0037,100.0019,900.0024,600.0025,000.0024,500.00
<br />PRICE
<br />
<br />380,500.00105,000.00333,900.00
<br />Black Castle General Contractors
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br />
<br />
<br />8,132.005,528.005,036.003,920.005,465.009,385.009,385.00
<br />
<br />
<br />55,667.0021,245.0020,391.0052,402.0013,811.0031,900.0027,777.0025,000.0024,500.0049,500.0049,500.00
<br />
<br />433,528.00132,288.00302,309.00
<br />TOTAL
<br />
<br />1,110,014.001,110,014.001,168,899.00
<br />AMOUNT
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br />
<br />$ $ $ $ $ $ $
<br />
<br />39.20
<br />
<br />220.00
<br />
<br />8,132.005,528.005,036.005,465.00
<br />
<br />55,667.0021,245.0020,391.0052,402.0013,811.0027,777.0025,000.0024,500.00
<br />
<br />UNIT
<br />433,528.00132,288.00302,309.00
<br />B5 Construction Company
<br />PRICE
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br /> $
<br />
<br />5,000.007,000.005,000.004,000.006,000.00
<br />
<br />
<br />50,000.0050,000.0025,000.0020,000.0075,000.0014,500.0014,000.0010,000.0025,000.0024,500.0049,500.0010,000.0049,500.00
<br />
<br />337,500.00150,000.00300,000.00
<br />TOTAL
<br />
<br />1,053,000.001,053,000.001,112,500.00
<br />AMOUNT
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br />
<br />$ $ $ $ $ $ $
<br />
<br />40.00
<br />
<br />100.00
<br />
<br />5,000.007,000.005,000.006,000.00
<br />UNIT
<br />
<br />50,000.0050,000.0025,000.0020,000.0075,000.0014,000.0025,000.0024,500.00
<br />PRICE
<br />Sustanite Support Services
<br />
<br />337,500.00150,000.00300,000.00
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br />
<br />
<br />7,000.001,000.005,000.002,000.006,000.008,000.008,000.00
<br />
<br />
<br />50,000.0010,000.0017,000.0040,000.0040,000.0010,000.0010,875.0025,000.0025,000.0024,500.0049,500.0049,500.00
<br />
<br />530,000.00300,000.00
<br />TOTAL
<br />
<br />1,045,875.001,045,875.001,103,375.00
<br />AMOUNT
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br /> $
<br />$ $ $ $ $ $ $
<br />R & B Group
<br />
<br />75.0020.00
<br />
<br />7,000.001,000.005,000.006,000.00
<br />UNIT
<br />
<br />50,000.0010,000.0017,000.0040,000.0040,000.0010,000.0025,000.0025,000.0024,500.00
<br />PRICE
<br />
<br />530,000.00300,000.00
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br />Hillridge Water Plant Improvements - Phase II Project
<br />
<br />
<br />5,000.002,000.006,000.005,250.002,000.007,500.009,500.009,500.00
<br />
<br />
<br />40,000.0030,000.0040,000.0060,000.0030,000.0021,750.0030,000.0025,000.0024,500.0049,500.0049,500.00
<br />
<br />375,000.00371,000.00
<br />TOTAL
<br />
<br />1,016,000.001,016,000.001,075,000.00
<br />AMOUNT
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br /> $
<br />$ $ $ $ $ $ $
<br />
<br />20.00
<br />
<br />150.00
<br />
<br />5,000.002,000.006,000.005,250.007,500.00
<br />UNIT
<br />W.W. Payton Corporation
<br />
<br />40,000.0030,000.0040,000.0060,000.0030,000.0030,000.0025,000.0024,500.00
<br />PRICE
<br />
<br />375,000.00371,000.00
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br />111111111111111
<br />145100
<br />QUAN.
<br />EA.
<br />L.S.L.S.L.S.L.S.L.S.L.S.L.S.L.S.L.S.L.S.L.S.L.S.
<br />S.Y.
<br />C.Y.C.A.C.A.
<br />UNIT
<br />inin
<br />or
<br />per
<br />floor
<br />Building,
<br />head),
<br />structural,
<br />completerequipment,
<br />described
<br />handrails,
<br />120-ft
<br />and
<br />programming
<br />and
<br />@
<br />Concrete
<br />sodding,
<br />architectural,
<br />Room
<br />backfill,
<br />plans
<br />gpm
<br />or
<br />TOTAL BID (A + B + C):
<br />controller
<br />on
<br />Precast
<br />and
<br />MCC
<br />for
<br />TOTAL BASE BID ITEMS (A):TOTAL BASE BID ITEMS (A):
<br />(1,000
<br />seeding
<br />associatedshown
<br />Station
<br />bedding
<br />all
<br />bollards,
<br />Pumps
<br />TOTAL CASH ALLOWANCE ITEMS (C):TOTAL CASH ALLOWANCE ITEMS (C):
<br />grading,
<br />"allowance"
<br />and
<br />TOTAL SUPPLEMENTAL BID ITEMS (B):TOTAL SUPPLEMENTAL BID ITEMS (B):
<br />pipe
<br />an
<br />Booster
<br />Booster
<br />foundation,
<br />ITEM DESCRIPTION
<br />appurtenances
<br />SF)
<br />stripping,
<br />to
<br />Include
<br />Case
<br />sidewalk,equipment,
<br />site
<br />and
<br />(1,000
<br />Split
<br />roof,
<br />limited
<br />electrical
<br />not
<br />room
<br />line,
<br />and
<br />including
<br />50'x20'
<br />Programming:
<br />but
<br />feedHorizontal
<br />drain
<br />(1)
<br />Work,
<br />Mobilization, complete in place, the sum of: (5% maximum)Siteplace, the sum of:Constructincludingdrains,chlorinemechanical,specifications, complete in place, the sum of:Oneequivalent,
<br /> complete in place, the sum of:Two (2) Horizontal Split Case Booster Pumps, (650 gpm @120-ft Head), or equivalent, complete in place, the sum of:Station Piping to include all booster
<br /> pump suction and discharge header piping as identified on the plans, including valves, fittings, and any requirements for proper operation of the plant as shown on plans and as described
<br /> in the specifications, complete in place, the sum of:Yard Piping to include all onsite water mains and drain lines outside booster station building as identified on the plans, including
<br /> proposed flanged connection to Ground Storage Tank, valves, fittings, wet connections, drain lines connection to downspouts and grate inlet, and any trench safety requirements as shown
<br /> on plans and as described in specifications, complete in place, the sum of:Removal of bends, abandonment of water lines and suction lines, and instlalation of blind flanges as shown
<br /> on plans and as described in specifications, complete ni place, the sum of:Wet connection to existing 12" water line, including two 12" gate valves and boxes, as shown on plans and
<br /> as described in specifications, complete in place, the sum of:Remove and replace 6" thick concrete pavement and driveway, including sawcutting, subgrade, reinforcement and joints, complete
<br /> in place, the sum of:Remove and replace existing 8-ft chain link fence, install double 8-ft wide swing access gate and pedestrian gate as shown on plans and as described in specifications,
<br /> complete in place, the sum of:Chlorine disinfection system, including but not limited to, scale for 150# chlorine cylinder, gas chlorinators, automatic switchovers, injectors, solenoid
<br /> valves and bypasses, gas sensors and alarms, wall-mounted self-contained breathing apparatus, high pressure booster pump, piping, feed lines, 1" schedule 80 PVC injection line, pipe
<br /> connections, chlorine injection manhole, electrical, and all other items as shown on plans and as described in specifications for a complete and operational chlorine disinfection system,
<br /> complete in place, the sum of:Electrical System Installation: Provide and install all work shown on the plans and described in specifications including as follows: provide and install
<br /> motor control center, lighting and receptacles, pump motor feeders and terminal boxes, electrical service equipment, autosensory controls, generator quick connect, and all required
<br /> appurtenances as shown on plans and as described in specifications for a complete operating system, complete in place, the sum of:Install extra cement stabilized sand12"x12" TS&V, complete
<br /> in place, the sum of:Electrical Service: Include an "Allowance" for electrical service by the local Electrical Service Provider. Exact amount will be reimbursed to Contractor upon submittal
<br /> of invoice from Electrical Service Provider for a lump sum of:ControllerSection 16-904 - "Controller," for a lump sum of:Represents Error Corrected by Engineer
<br />123456789
<br />101112131415
<br />NO.
<br />CA-1CA-2
<br />ITEM
<br />A. BASE BID ITEMS:B. SUPPLEMENTAL BID ITEMS:C. CASH ALLOWANCE ITEMS:
<br />City Bid #19015HDR Job No. 19-014Bid Date 6/25/19
<br />
<br />
|