My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-13-20 Regular Meeting of the La Porte City Council
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
City Council
>
City Council
>
City Council Meetings
>
2020
>
01-13-20 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 4:15:06 PM
Creation date
4/3/2025 3:22:51 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
1/13/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Appropriation <br />Agenda Date Requested:January 13, 2020 <br />Source of Funds:General Fund CIP <br />Requested By: Ray Mayo, Director <br />Department: Public Works <br />Account Number: 015-7071-531-1100 <br />Amount Budgeted: $384,340.00 <br />ReportResolution Ordinance <br />Amount Requested: $298,466.75 <br />Exhibits: Engineers Recommendation, Bid Tabulation <br />Budgeted Item:Yes No <br />and Bid from Brooks Concrete, Inc. <br />SUMMARY <br />Approved in FY 2018-19 Budget was a Capital Improvement Project for a pedestrian sidewalk <br />from Broadway to the La Porte City limits (at Morgan’s Point city limits) along the south side of <br />East Main Street. This project does not encompass any sections west of Broadway. East Main <br />sidewalk completed design near the end of the FY 2018-19 budget year. It is anticipated that <br />work would begin within 30 days after a contract execution with a project time of 120 calendar <br />days. <br />Sealed Bid #20002, Main Street Sidewalk Improvements, was opened and read on November <br />14, 2019. Sixty-eight (68) vendors were notified, with thirty-eight (38) contractors downloading <br />the bid documents. Four (4) Bids were received. Brooks Concrete, Inc. submitted the lowest <br />bid in the amount of $270,466.75. Brooks Concrete has performed multiple jobs for the City in <br />the past and has an established record of excellent performance. Staff’s recommendation is to <br />award Sealed Bid #20002 to Brooks Concrete, Inc. in the amount of $270,466.75 and a <br />construction contingency of $28,000.00 (~10%). Total authorization for Main Street Sidewalk <br />Improvements will be $298,466.75 <br />RECOMMENDED MOTION <br />I move to award Sealed Bid #20002 for Main Street Sidewalk Improvements to Brooks <br />Concrete Inc. and authorize the City Manager to enter into a construction contract totaling <br />$270,466.75 and approval of construction contingency of $28,000, for a total authorization <br />of $298,466.75. <br />r <br />Approved for the City Council meeting agenda <br /> <br />Corby D. Alexander, City Manager Date <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.