Laserfiche WebLink
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Appropriation <br />Agenda Date Requested:September 14, 2020 <br />Source of Funds:N/A <br />Requested By:Ray Mayo, Director <br />Department:Public Works <br />Account Number:N/A <br />Amount Budgeted:N/A <br />ReportResolutionOrdinance <br />Amount Requested:N/A <br />Exhibits:Area Map;ROW Dedication Deed;Tree Conflicts <br />Budgeted Item:YesNo <br />SUMMARY& RECOMMENDATION <br />th <br />Staff identified the area along the north side of W.Main Street, between 8Street and <br />th <br />7Street, as a potential location to provide better sidewalk connectivity. However, trees <br />exist within the public right-of-wayand conflict with theproposed location of the <br />sidewalk.During field investigation of the proposed sidewalk location, staff was <br />approached by Sherman Moore, property owner of 820 W.Main Street, and the tree <br />conflicts were discussed. In order to preserve the trees and construct the sidewalk, Mr. <br />Moore has agreed to dedicate a portion of his property as public right-of-way.Staff <br />recommends acceptance of the right-of-way dedication deed to allow for the <br />construction of the public sidewalk. <br />Additionally, there are areas of existing sidewalk, along W Main Street, that are <br />impacted by existing tree roots. Realizing the destruction that the existing trees have <br />caused to the existing sidewalk, staff intends to coordinate with a landscape architect <br />to determine alternative options to address tree/sidewalk conflicts along W Main Street. <br />Initial consideration is given to replacing some treeswith trees with less invasive root <br />systems. The potential to work around existing trees will be evaluated, butmay be <br />challenging due to changes in sidewalk elevation required to cross existing tree roots. <br />The concept of replacing trees and repairing sidewalks aligns with the goal of <br />enhancing of Main Street.Staff is requesting input from Council regarding the potential <br />to enhance Main Street by repairing sidewalk and replacing existing trees. <br />Benefits: <br />Allows sidewalk to be constructed along the north side of WMain Street, <br />thth <br />between 8Street and 7Street, within areas dedicated for public use, without <br />requiring tree removal. <br /> <br />