My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-22-21 Regular Meeting of the La Porte City Council
LaPorte
>
Agenda packets
>
City Council
>
2021
>
02-22-21 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 2:40:35 PM
Creation date
4/3/2025 3:25:30 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
2/22/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Potential improvements include: increasing storm sewer pipe capacity and level of <br />service from a 3-year rain event, to the Atlas-14 100-year rain event by replacing <br />approximately 7000 LF of storm sewer pipe (various sizes, 24" - 54"); replacing the <br />existing 3-foot wide inlet openings with inlets having a minimum opening of 5-feet; <br />creating overland sheet flow path(s) by reconstructing/regrading approximately 46,700 <br />SY of concrete paving within the project area bounded by: Fairbrook Lane to the south; <br />Willowspring Creek to the west; Centerpoint Energy powerline corridor to the north; and <br />Gladwyne Lane to the east. The estimated total project cost is $11,400,010. <br /> <br /> <br />Benefits: <br /> <br /> <br /> Consistent with priorities identified within the Harris County Multi-Hazard <br />Mitigation Action Plan <br /> The City's Comprehensive Plan - 2018 Five Year Update prioritized twelve <br />actions, with Infrastructure and Drainage Improvements listed as the top <br />priorities. <br /> <br />Liabilities: <br /> Improvements are not fully funded. Not applying would further delay ability to <br />fully fund the project. <br /> Flood risk reduction is further delayed. <br />ACTION REQUIRED BY CITY COUNCIL <br />Hold a public hearing regarding the submission of an application to the Texas <br />General Land Office (GLO) for a Texas Community Development Block Grant - <br />Mitigation (CDBG-MIT) grant. <br />Approved for the City Council meeting agenda <br /> <br />Corby D. Alexander, City Manager Date <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.