My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-26-21 Regular meeting of La Porte City Council - CC attendance policy
LaPorte
>
Agenda packets
>
City Council
>
2021
>
07-26-21 Regular meeting of La Porte City Council - CC attendance policy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2022 1:42:43 AM
Creation date
4/3/2025 3:26:44 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
7/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Appropriation <br />Agenda Date Requested:July 26,2021 <br />019 Drainage <br />Requested By:Ray Mayo, Director <br />033 Streets <br />Source of Funds:003 Utilities <br />Department:Public Works <br />019-7071-531-1100 <br />ReportResolutionOrdinance <br />019-7071-531-9150 <br />033-7071-531-1100 <br />Account Number:003-7071-531-1100 <br />Exhibits:Bid Tabulation 21011;Access Report Public <br />Purchase;Civcast Planholders Report; D&W Contractors Bid; <br />$4,930,452.00 <br />Amount Budgeted: $100,000.00 <br />Amount Requested:$5,030,452.00 <br />Budgeted Item:YesNo <br />SUMMARY& RECOMMENDATION <br />th <br />Bids were received on June 29, 2021 for 7Street and Drainage Improvementsproject, <br />Bid # 21011.Requests for bids were advertised in the Bay Area Observer, Public <br />Purchase, Civcast and the City website. A total of 193 contractorswere notified,with <br />110 contractorsdownloading the bid documents.The City received nine (9) bids, with <br />the low bid submitted by D&W Contractors, Inc. of Houston, Texas. <br />The 7th Street Paving and Drainage Improvements project was approved by City <br />Council in June 2019. The project began with asurvey and a Preliminary Engineering <br />Report with engineering consultant, Cobb Fendley, andengineering services <br />commenced in November of 2019. The project has received funding in FY 20 and FY <br />21 CIP budgets. <br />The project consists ofreconstruction of streets and stormsewer along 7th Street from <br />Main Street to Fairmont Parkway. The work consistsof replacing existing 20-ft wide <br />asphalt roads and roadside ditches with 28-ft concrete curb and gutter road with <br />underground storm system. The new roadway will have 5-ft wide sidewalks on both <br />sides of the road. The new stormsewer system will connect to existing storm systems <br />at D Street,while a new outfall, discharging into Harris County Drainage Channel <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.