My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-14-22
LaPorte
>
Agenda packets
>
City Council
>
2022
>
03-14-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2022 12:13:39 AM
Creation date
4/3/2025 3:28:36 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> LƓƷĻƩĭƚƓƷźƓĻƓƷğƌ ĻƩƒźƓğƌƭ /ƚƒƦğƓǤ \[\[/ <br /> P. O. Box 698 Deer Park, Texas 77536-0698 <br /> FAX (281) 884-0399 <br />(281) 884-0300 <br /> <br />October 28, 2021 <br />City of La Porte <br />604 W. Fairmont Pkwy <br />La Porte, TX 77571 <br /> <br />w9ʹ tƩƚƦƚƭĻķ tźƦĻƌźƓĻ Ώ L/ ЊЋͼ aĻƷŷğƓƚƌ tźƦĻƌźƓĻ <br /> <br />Intercontinental Terminals Company LLC (ITC) respectfully makes this application for a Permit and Franchise <br />Agreement (if required) to the City of La Porte (City) ŅƚƩ ƷŷĻ źƓƭƷğƌƌğƷźƚƓͲ ƚƦĻƩğƷźƚƓ ğƓķ ƒğźƓƷĻƓğƓĭĻ ƚŅ Њ Α ЊЋ <br />Inch underground Methanol Pipeline together with associated facilities within the City limits of La Porte. <br /> <br />Included in this package of information please find the following: <br /> <br />Pipeline Permit Application <br />Franchise Permit Application <br />Engineering plans and drawings of the complete route through the city including: <br />o Alignment sheets <br />o Construction (Drill) drawings <br />o Permit Drawings of road and ditch crossings <br />o Cathodic Protection and AC Mitigation Drawings <br />o AC Mitigation Drain Point Plats and Typicals <br />o Electrical drawings for reference only <br />Pipeline Data Sheet <br />MSDS product sheets for Methanol <br />Certificate of Insurance <br />Application Fee in the amount of $1,000 <br />Hold Harmless Letter executed by ITC <br /> <br />ITC certifies the following per Chapter 102, Article IV of the La Porte Code of OrdiƓğƓĭĻƭ ĻƓƷźƷƌĻķ ͻtźƦĻƌźƓĻ <br />ƩğƓƭƦƚƩƷğƷźƚƓͼ {Ļĭ ЊЉЋΏЋЌЎ͵ЊЉͲ ЊЊ εЊЋʹ <br /> <br />10. The pipeline will comply with the applicable standards required by this article as well as all <br />applicable federal, state and local laws and regulations. <br /> <br />11. ITC shall, at any time in the future, where such pipeline or portion thereof crosses or is laid within, <br />under or across any street, road or utility right-of-way, drainage way or public way existing or <br />projected at the time the permit is issued, reposition such pipeline (which shall include lowering or <br />raising the pipeline, as well as casing it, if required) at the permittee's sole expense, when the city <br />reasonably requires such action incidental to public construction or public improvement. <br /> <br /> <br /> ITC is a safe and dedicated partner whose associates are recognized as <br />proud leaders in customer care and operational excellence. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.