Laserfiche WebLink
Attachment "B" <br />100 Acre-Foot Interlocal Detention Pond <br />Revision 1 <br />Date: July 30, 2021 <br />Revision 1: August 27, 2021 <br />Principal / <br />Revision 2:Project Senior CADD <br />Managing Project EngineerAdmin <br />ManagerTechnician <br />Total HoursTotal Cost <br />Director <br />HOURLY RATE 210$ 165$ 120$ 96$ 60$ <br />ITEM 1: STUDY PHASE SERVICES: <br />Task 1 Î Impact Analysis Report <br /> 1.A Project Management41616365,400$ <br /> 1.B Data Collection816243,240$ <br /> 1.C Existing conditions Hydraulics and Hydrology21640587,860$ <br /> 1.D Proposed conditions analysis424804014818,240$ <br /> 1.E Develop estimated construction costs2816263,660$ <br /> 1.F Impact Analysis Report284016668,076$ <br /> 1.G QAQC4168284,440$ <br />Subtotal Hours18962160028 <br />Subtotal Fee$ 15,8403,780$ 25,920$ -$ -$ 50,916$ <br />Task 2: Environmental Analysis <br /> 2.A Phase I Environmental Site Assessment (ESA)12406,780$ <br /> 2.B Wetlands Delineation / WOUS Identification and Reporting220408,520$ <br /> 2.C AJD/PJD Preparation and Submittal24243,960$ <br /> 2.D Threatened and Endangered Species Habitat Assessmen24243,960$ <br /> 2.E Cultural Resources Desktop Analysis24243,960$ <br />Subtotal Hours84415200204 <br />Subtotal Fee$ 7,2601,680$ 18,240$ -$ -$ 27,180$ <br />TOTAL FEES: STUDY PHASE SERVICES:$ 78,096 <br />ITEM 2: FINAL DESIGN SERVICES: <br />Task 3: Topographic Survey Services (Amani Engineering) <br />a$ 26,320 <br /> 3.A Topographic Survey of Project Are <br />Subtotal Hours <br />Subtotal Fee$ 26,320 <br />Task 4 Î Project Management <br /> 4.A Project Progress Meetings88162,280$ <br /> 4.B Project Site Visits88162,280$ <br /> 4.C Coordination with HCFCD88162,280$ <br /> 4.D Coordination with subconsultants1616324,560$ <br /> 4.E Coordination with private utilities881,320$ <br />Subtotal Hours0484000 <br />Subtotal Fee$ 7,920-$ 4,800$ -$ -$ 12,720$ <br />Task 5: Civil Design Services <br /> 5.A Project Drawings <br /> Title Page1225597$ <br /> Index of Sheets1225597$ <br /> Legend & Abbreviations1225597$ <br /> General Notes1225597$ <br /> Existing and Proposed Typical Sections248141,578$ <br />HCFCD Express Review Sheet246810$ <br /> Project Layout128111,173$ <br />Quantity Summary Sheet123357$ <br />Existing Drainage Area Maps1247789$ <br />Proposed Drainage Area Maps248141,578$ <br />Hydraulic Calculations1247789$ <br /> Plan and Profile Sheet for Outfall141224414,614$ <br />Detention Pond Grading Plan and Development of 3D Terrain Model44024024052459,280$ <br />Detention Pond Horizontal Control Plan21624424,554$ <br />Cross-Sections with Cut and Fill Calculations2840409010,380$ <br /> Demolition Plan2816262,826$ <br /> Construction Access Plan2816262,826$ <br /> Traffic Control Plan / Construction Phasing Plan128111,173$ <br /> Traffic Control Details1247789$ <br /> SWPPP Layout 2816262,826$ <br /> Modification of SWPPP Details1247789$ <br /> Modification of Storm Sewer Details1247789$ <br /> 5.B Estimate of Probable Construction (60%, 90%, and Final)1424293,750$ <br /> 5.C Specifications2824344,620$ <br />Subtotal Hours10904144380952 <br />Subtotal Fee$ 14,8502,100$ 49,680$ 42,048$ -$ 108,678$ <br />Task 6: Geotechnical Analysis (Ninyo and Moore) <br />s$ 35,999 <br /> 6.A Geotechnical Analysi <br /> 6.B Site Clearing for Access (3 days @ $3,200/day)$ 9,600 <br />Subtotal Hours <br />Subtotal Fee$ 45,599 <br />Task 7: Bid Phase Services <br />pre-bid meeting & compile notes224570$ <br /> 7.A Attend <br />224570$ <br /> 7.B Prepare pre-bid responses & respond to question <br /> 7.C Attend bid review meeting224570$ <br />224570$ <br /> 7.D Prepare bid recommendation letter & bid tabulation <br />Subtotal Hours0880016 <br />Subtotal Fee$ 1,320-$ 960$ -$ -$ 2,280$ <br />TOTAL FEES: FINAL DESIGN SERVICES$ 195,597 <br />ITEM 3: CONSTRUCTION PHASE SERVICES: <br />Task 8: Construction Phase Services <br /> 8.A Respond to submittals216182,250$ <br />881,320$ <br /> 8.B Respond to RFI <br /> 8.C Revisions 416202,580$ <br /> 8.D Preparation of Record Drawings41624444,884$ <br />0184824090 <br />Subtotal Hours <br />$ 2,970-$ 5,760$ 2,304$ -$ 11,034$ <br />Subtotal Fee <br />$ 11,034 <br />TOTAL FEES: CONSTRUCTION PHASE SERVICES <br />$ 284,727 <br />TOTAL FEES: PER, FINAL DESIGN, & CONSTRUCTION PHASE <br />ADDITIONAL SERVICES: <br />Task 9: Additional Environmental Analysis <br /> 9.A Nationwide Permit / Regional General Permit (if required8244010,440$ <br /> 9.B Cultural Resources Constraints Analysis (pending results of THC424409615,360$ <br /> 9.C Phase II Environmental Site Assessment (pending results of Phase I ESA48080 <br />$ 23,640 <br />Subtotal Hours16128160096 <br />Subtotal Fee$ 21,1203,360$ 19,200$ -$ 5,760$ 49,440$ <br />Task 10: Subsurface Utility Engineering (Amani Engineering) <br /> 10.A QL-A and QL-B SUE for 30" Spectra Energy Pipeline$ 4,820 <br />Subtotal Hours <br />Subtotal Fee$ 4,820 <br />Task 11: Construction Staking (Amani Engineering) <br />$ 2,955 <br /> 11.A Construction Staking <br />Subtotal Hours <br />Subtotal Fee$ 2,955 <br />$ 57,215 <br />TOTAL FEES: ADDITIONAL SERVICES <br />$ 341,942 <br />TOTAL FEES: STUDY, FINAL DESIGN, CONSTRUCTION PHASE SERVICES, AND ADDITIONAL SERVICES <br />8/30/2021Page1of1 <br /> <br />