My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7-11-22
LaPorte
>
Agendas
>
.AGENDAS
>
Drainage Committee
>
2022
>
7-11-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2023 8:23:31 AM
Creation date
5/3/2025 3:56:17 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
Date
7/11/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MEMORANDUM <br /> <br /> <br /> <br /> <br />DATE: June 27, 2022 <br /> <br />TO: Lorenzo Wingate P.E., C.F.M. <br />Assistant Director of Public Works <br /> <br />FROM: Jeremy Ratcliff <br />Precinct Coordinator <br /> <br />th <br /> <br />RE: City of La Porte Drainage Committee Meeting (July 11) <br />_______________________________________________________ <br /> <br /> <br />1. B512-00-00-00-E001 Tributary and Conveyance Improvements on Brookglen area <br /> <br /> We have completed 50% design submittal for this project. The project has <br />subdivided into two bid package for bid ready submittal, North Detention Basin <br />and South Detention Basin. We are expecting to receive bid ready submittal of <br />North Detention Basin within this month, June. <br /> For South Detention Basin, we are waiting for LONO (Letter of No Objection) <br />from utilities company to submit the Street and Alley Closure (SAC) application <br />form to the City of LaPorte. Then we will prepare bid ready submittal for South <br />Detention Basin based on approval or rejection of street abandonment process. <br /> For the NORTH basin we will be submitting SAC application to city council very <br />soon͵ <br /> All eight houses at South compartment have been demolished <br /> <br />2. B112-00-00-G001 Brookglen Subdivision Drainage Improvements <br /> Project lead is City of La Porte <br /> HCFCD Contribution ($2.9M) received by the City on 05/12/22 <br /> Per the City, a consultant was engaged to prepare a proposal <br /> HCFCD awaits invitations to project progress meetings <br /> <br /> <br />3. F101-06-00-E002 Partnership Project with La Porte to reduce flooding <br /> Project is being evaluated internally to see what the next steps should be <br /> <br /> <br /> <br />4. F212-00-00-C001 Channel Conveyance Improvements -This project stems from the <br />Galveston Bay Watershed Planning study and consists of three components. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.