Laserfiche WebLink
LA PORTE REDEVELOPMENT AUTHORITY <br />SCHEDULE COMPARING ACCUALREIMBURSABLE COSTS <br />WITH EXHIBITS OF THE DEVELOPMENT AGREEMENT <br />(SEE ACCOMPANYNGDSCLAIMEROFOPINION AND ��0 C <br />SU���cH <br />EXPLANATION OF AGREED -UPON PROCEDURES PERFORMED) t U �� <br />REIMBURSABLE <br />REIMBURSABLE <br />COSTS <br />COSTS <br />PNOINEERING PORTCROSSING <br />PORTCROSSING <br />FSTIMATE LAND, LP <br />LAND, LP <br />DESCRIPTION EXHIBITS AT MAY 21. 2009 <br />AS OF 1ANUARY 21. 2015 <br />CAPITAL IMPROVEMENT BUDGET <br />DESCRIPTION AND ESTIMATED COSTS <br />Streets with Storm Systems _ <br />Powell Road (100' ROW) <br />$ <br />1,795,000 <br />Powell Road (60' ROW) <br />841,000 <br />Abandon Powell Road <br />- <br />Wharton Weems Boulevard <br />968,000 <br />McCabe Road <br />225,000 <br />SUBTOTAL <br />$ <br />3,829,000 <br />$ <br />3,560,057 <br />$ <br />Water Distribution System <br />12" Public Mains <br />$ <br />320,000 <br />O€tsiteSegment Crossing SH 146 (IX) <br />351,000 <br />SUBTOTAL <br />$ <br />671,000 <br />S <br />383,756 <br />$ <br />S_ anitag Sewer System_____ <br />Lift Station I Force Main <br />5 <br />137,000 <br />Public Mains 8" -12" <br />308.000 <br />O€fisite Public Mains <br />66,000 <br />SUBTOTAL <br />S <br />511,000 <br />S <br />955,573 <br />S <br />Drainage Projects _ <br />Stormwater Detention 1 Drainage <br />-Acquisition o€32 Acres <br />S <br />2,300,000 <br />5 <br />2,304,431 <br />S <br />-Cons=tion_ Excavation <br />1,360,000 <br />1,002,032 <br />-Construction_ Storm Sewer <br />1,232,000 <br />841,284 <br />25A00 <br />SUBTOTAL <br />$ <br />4,892,000 <br />$ <br />4,147,747 <br />$ <br />25,000 <br />Sidewalks <br />Sidewalks I Pedestrians Trails along Major <br />Roadways 1 Drainageways <br />$ <br />120,000 <br />$ <br />45,443 <br />$ <br />Landscaping <br />Along Major Roadways <br />$ <br />300,000 <br />$ <br />630,279 <br />$ <br />29,763 <br />Clearing <br />Public ROW and Easements <br />$ <br />120,000 <br />$ <br />182,001 <br />Engineering <br />$ <br />1,303,000 <br />$ <br />931,299 <br />$ <br />3,133 <br />Developer Interest <br />$ <br />- <br />$ <br />1,364,327 <br />$ <br />10,086 <br />TOTAL <br />S <br />11,746,000 <br />$ <br />12,0%,487 <br />S <br />67,982 <br />Schedule B <br />Page I of 2 <br />