My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-21-11 Planning and Zoning
LaPorte
>
Agendas
>
.AGENDAS
>
Planning/Inspections
>
Planning and Zoning Commission
>
2011
>
04-21-11 Planning and Zoning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:08:20 AM
Creation date
5/3/2025 4:04:47 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
4/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TRAFFic EjvGijvEERs, / C. <br />'Fable 2 Background and Future LOS <br />LOS / Delay (s) <br />SH 225 EBFR at Sens Road <br />SH 225 WBFR at Sens Road <br />AM Peak <br />PM Peak <br />Background <br />Future <br />Background <br />Future <br />B/13 <br />B/12 <br />A/9 <br />A/10 <br />A/8 <br />A/9 <br />B/14 <br />B/14 <br />As shown in Table 2, the added <br />traffic is not projected to <br />substantially impact the LOS at <br />the two analysis intersections. <br />The existing volumes are low <br />compared to the capacity of the intersections and will remain comparatively low even with the addition <br />of site -generated traffic. The per -vehicle delays at the intersection of SH 225 EBFR at Sens Road in the <br />AM Peak is actually projected to improve: this is due to the high number of right -turns onto the SH 225 <br />EBFR for site -generated traffic. Vehicles making the right -turn movement incur less delay than the <br />average vehicle utilizing the intersection because of their ability to make a right -turn on red. <br />Because the analysis indicates the distribution center will have no significant traffic impacts, no street or <br />signal improvements are recommended. If you have any questions regarding the results of this analysis, <br />please contact me at 713-398-7461 or e-mail r u',, <br />Sincerely, <br />LV-,, 4 ->TV <br />Dustin Qualls, PE, PTOE <br />Principal <br />Attachments <br />AM and PM Peak Hour Turning Movement Counts <br />ITE Trip Generation <br />Existing Capacity Analyses <br />Future Capacity Analyses <br />THE TEAM YOU CAN DEPEND ON PAGE 4 OF 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.