Laserfiche WebLink
IV. <br />CITY has determined that adequate resources are available to CITY to furnish potable water <br />to COMPANY based on the following terms and conditions, to -wit: <br />(A) COMPANY shall pay to CITY a one-time administrative fee of $12,500 <br />(B) The total amount of potable water approved to COMPANY is established at Six Thousand Two - <br />Hundred Fifty (6,250) gallons per day. This number is based on an average of fifty (50) gallons <br />per employee per day as established by CITY. <br />(C)The average monthly volume of One Hundred Ninety Thousand Six Hundred Twenty Five <br />(190,625 gallons is established by multiplying the average daily volume by a factor of 30.5, <br />which shall be used to facilitate CITY'S utility service billings. <br />(D)Nothing contained in this Agreement shall obligate CITY to furnish more than the average <br />monthly volume of One Hundred Ninety Thousand Six Hundred Twenty Five 19( 0,6251 <br />gallons. Repeated consumption greater than the established average monthly volume may result <br />in termination of service. <br />(E) COMPANY shall pay the standard water tap/meter fee based on CITY'S current tap/meter <br />fee schedule. Upon final approval of COMPANY'S on -site and/or off -site utility <br />construction by CITY, COMPANY shall pay the CITY'S standard water deposit fee through <br />CITY'S Utility Billing Division prior to receiving water service from CITY. <br />(F) The cost of water up to the average monthly volume of One Hundred Ninety Thousand Six <br />Hundred Twenty Five 19( 0.625) gallons shall be billed at one hundred fifty percent (150%) of <br />the CITY'S rate as established from time to time for commercial customers inside its corporate <br />limits. <br />(G)The cost of water for amounts used in excess of the established average monthly volume shall <br />be billed at two hundred percent (200%) of the CITY'S rate as established from time to time for <br />commercial customers inside its corporate limits. <br />(H)COMPANY shall submit a preliminary site plan showing the total acreage of the tract including <br />present and proposed improvements and a suitable location map of the site. COMPANY'S <br />development may be subject to certain additional requirements as described in Exhibit A. These <br />requirements shall be shown on the final site plan and approved by City. <br />(1) COMPANY'S site design and site development will, in certain cases, be subject to specific <br />"Rules and Regulations" as defined in Exhibit "C" of COMPANY'S Industrial District <br />Agreement with CITY. <br />(.) All plumbing installed by COMPANY connected to the domestic water line from CITY, shall <br />meet all applicable State of Texas and CITY plumbing code requirements. <br />(K)A reduced pressure zone backflow preventer shall be installed and maintained by COMPANY <br />to protect CITY from any possible cross -connections. <br />