My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-01-11 Meeting of the La Porte Development Corporation Board of Directors
LaPorte
>
.Agendas
>
La Porte Development Corporation/4B
>
2011
>
08-01-11 Meeting of the La Porte Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 10:23:20 AM
Creation date
7/25/2025 10:36:52 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
8/1/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT E - Schedule of Values <br />Mainly Drinks <br />223 Main Street <br />La Porte, TX, 77571 <br />Bid Tabulation Form <br />Division Items <br />L.W.I. Construction <br />Building Size <br />Total <br />Subcontractor <br />1,800 <br />1,800 <br />Cost <br />sq. ft. <br />sq. ft. <br />Total Cost <br />Per S ft <br />01 <br />General Conditions <br />$ 3,200.00 <br />$1.78 <br />Fees (Meters, Taps, etc.) - By Owner <br />$ <br />- <br />Permits <br />$ <br />900.00 <br />Printing Fees <br />$ <br />100.00 <br />Dumpster Fees <br />$ <br />700.00 <br />Demolition <br />$ <br />1,500.00 <br />02 <br />Site Work <br />Erosion Control <br />$ <br />- <br />Termite Protection <br />$ <br />- <br />Earthwork <br />$ <br />- <br />Traffic Control for Approaches <br />$ <br />Site Clearing <br />$ <br />- <br />Soil Treatment (Lime) <br />$ <br />- <br />Concrete-Paving,Conc Walks,Curbs,Walkways <br />$ <br />- <br />Fenctng4 <br />$ <br />Site Utilities <br />$ <br />- <br />8" Water meter <br />$ <br />- <br />Reroute existing water line <br />$ <br />- <br />Pavement Stripping, Handicap, Wheel Stops <br />$ <br />- <br />Landscape. Planting, & Sprinkler Systems <br />$ <br />- <br />03 <br />Concrete <br />$ 1,500.00 <br />$0.83 <br />Foundation <br />$ <br />- <br />Handicap Ramp (Allowance) <br />$ <br />1,500.00 <br />04 <br />Masonry <br />$ 3,400.00 <br />$1.89 <br />Stucco <br />$ <br />- <br />Brick <br />$ <br />- <br />Stone <br />$ <br />- <br />Granite Bar Top (Allowance $60.00/sgft) <br />$ <br />3,400.00 <br />06 <br />Metals <br />$ 1,500.00 <br />$0.83 <br />Metal Building <br />$ <br />- <br />Metal Building Erection <br />$ <br />- <br />Handrails and T- Ornamental iron fence <br />$ <br />4,500.00 <br />06 <br />Wood and Plastics <br />$ 7,799.20 <br />$4.33 <br />Carpentry <br />$ <br />2,500.00 <br />Millwork <br />$ <br />5,299.20 <br />$ <br />- <br />07 <br />Thermal and Moisture Protection <br />$ 733.37 <br />$0.41 <br />Metal Bldg Roof 3" Vinyl backed Insulation <br />$ <br />- <br />Damp Proofing, Caulking <br />$ <br />- <br />Tempe€ed Glass <br />$ <br />733.37 <br />08 <br />Doors and Windows <br />$ 3,500.00 <br />$1.94 <br />Doors, Frames, & Hardware <br />$ <br />1,800.00 <br />Doors, Frames, & Hardware install Only <br />$ <br />- <br />Storefront System, Glass, & Windows <br />$ <br />- <br />Overhead Doors <br />$ <br />- <br />Secondary Entry Doors <br />$ <br />1,700.00 <br />$ <br />- <br />09 <br />Finishes <br />$ 21,607.24 <br />$12.00 <br />E.F.L's Bldg A & B <br />$ <br />- <br />Gypsum, Wood framing, FRP & Wood fence <br />Material & Labor <br />$ <br />4,400.00 <br />Carpet <br />$ <br />- <br />l ►. <br />
The URL can be used to link to this page
Your browser does not support the video tag.