My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-06-15 Meeting of the La Porte Development Corporation Board of Directors
LaPorte
>
.Agendas
>
La Porte Development Corporation/4B
>
2015
>
04-06-15 Meeting of the La Porte Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2015 9:58:57 AM
Creation date
7/25/2025 10:38:06 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
4/6/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Retail or Restaurant Re-Development/Blight Removal/EHG (Higher) 9 <br />9 <br />Quality Waterfront Development 8 <br />Main Street Improvements 7 <br />New Retail/Restaurant Development (Lower) 6 <br />Retail or Restaurant Re-Development/Blight Removal/EHG (Lower) 6 <br />Industry - NEW Development (Higher) 5 <br />NEW Office/HQ Development 4 <br />NEW Office/Regional Development 4 <br />Industry - NEW Development (Lower) 3 <br />Industry - RETENTION/EXPANSION (Higher) 3 <br />Industry - RETENTION/EXPANSION (Lower) 2 <br />Airport Re-Development 1 <br />Project's 10 Year TAX or PILOT (Payments in Lieu Of Taxes) Revenue <br />all <br />ure includes <br />estimated tax and/or PILOT revenues for each project type. Please note that some of these values are based <br />upon hypothetical, and, therefore, current best estimates. <br />Project's Multiplier Value (Up to 4) <br />414 <br />Staff assigned a value, from a maximum of to a minimum of , for each project. A value of means that the <br />project will have a significant multiplier effect to bring new money and/or people into the local economy. A <br />1 <br />value of means that the project will have little or no multiplier effect to bring new money and/or people into <br />the local economy. <br /># of New Full Time Jobs <br />0 <br />therefore, current best estimates. Please note that all retail jobs are considered to be <br /> <br />Full Time Job Avg. Value <br />0.150.075 <br />Staff assigned a value, from a maximum of to a minimum of , for each type of <br />0.15 <br />with each project type. A value of was assigned to higher paying, white collar, engineering, engineering <br />0.125 <br />design, or executive positions. A value of was assigned to highly skilled positions for a process technician <br />0.100.075 <br />and/or advanced manufacturer. A value of was assigned to skilled positions. A value of was assigned <br />to unskilled positions. <br />Project's Existing 10 Year Incentives <br />Data in this column identifies all other local incentives, like PILOT abatements under an existing IDA or <br />scheduled TIRZ reimbursements, that any project may be entitled to receive. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.