My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-22-16 Meeting of the La Porte Development Corporation Board of Directors
LaPorte
>
.Agendas
>
La Porte Development Corporation/4B
>
2016
>
02-22-16 Meeting of the La Porte Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 11:12:54 AM
Creation date
7/25/2025 10:38:53 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
2/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
281-339,2400 <br />Proposal Submitted to: <br />Phone: <br />Date: <br />4Ever Clear Pool Service / Stacy Down <br />832-274-3358 (cell) <br />01/03/2016 <br />Mailing Address: <br />Location Address: <br />101 South Iowa Av <br />LaPorte, TX 77571 <br />Email: stacy@4everclearpools.com <br />We hereby submit specifications and estimates for: <br />1. Power wash building. <br />2. Wire brush all areas of rust before putting on primer. <br />3. Prime entire building before painting. <br />4. Paint building outside, as discussed with customer using Sherwin-Williams Super Paint. <br />5. Replace two (2) doors as discussed with customer. <br />6. All colors will be customer's choice of color and texture. <br />Note: Add stripe on two sides of building as discussed with customer will be five to eight hundred <br />dollars. <br />"NOTE: FRONT DOOR AND SHUTTERS ARE NOT INCLUDED UNLESS OTHERWISE SPECIFIED" <br />We hereby propose to furnish material and labor — complete in accordance with the above specifications, for the sum of: <br />Seven Thousand Eight Hundred Dollars ($7,800.00) mm <br />Payment to be made as follows: ON COMPLETION <br />g p p �like""manne'rac�.or.. ung to standard <br />t <br />All material is guaranteed to be as specified. All labor to be completed in a workmari � o standard practices. <br />Any alteration or deviation from the above specifications involving extra costs will be executed only upon written orders, and will <br />become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents, or delays beyond our <br />control. <br />Acceptance of Proposal —The above <br />prices, specifications and conditions are <br />satisfactory and are hereby accepted. <br />You are authorized to do the work specified. <br />Payment will be made as outlined above. <br />Authorized Signature <br />Note: This proposal may be withdrawn by us if not accepted within 30 days. <br />Signature: <br />AMERICAN TRADITION *TEXAS PRIDE* SWISS TIMING <br />Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.