My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-27-17 Meeting of the La Porte Development Corporation Board
LaPorte
>
.Agendas
>
La Porte Development Corporation/4B
>
2017
>
03-27-17 Meeting of the La Porte Development Corporation Board
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2017 9:16:11 AM
Creation date
7/25/2025 10:39:07 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Development Board Corporation/Type B
Meeting Doc Type
Agenda Packet
Date
3/27/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Map KeyNumber of DirectionDistanceElevSiteDB <br />Records(mi/ft)(ft) <br />YES <br />SIR & Inventory Control: <br />NO <br />Exempt System Suction: <br /> <br />Spill and Overfill Prevention <br /> <br />YES <br />Tight Fill Fit Container/Bucket: <br />YES <br />Factory Spill Container/Bucket: <br />YES <br />Delivery Shut-Off Valve: <br />NO <br />Flow Restrictor Valve: <br />NO <br />Alarm(set@<=90%) w/3a or 3b): <br />NO <br />N/A-All Deliveries to Tank<=25 <br />gal: <br />YES <br />Comp. Release Detect. <br />Compliance: <br />YES <br />Piping Release Detect. <br />Compliance: <br />YES <br />Spill/Overfill Prevent. <br />Compliance: <br />NO <br />Comp. Release Detect. <br />Variance: <br />NO <br />Piping Release Detect. <br />Variance: <br />NO <br />Spill/Overfill Prevent. Variance: <br />TWO POINT SYSTEM <br />Stage 1 Vapor Recovery: <br />01/01/1984 <br />Stage 1 Installation Date: <br /> <br />Tank Information <br /> <br />96247FULLY REGULATED <br />UST ID:Regulatory Status: <br />3NO <br />Tank ID:Empty: <br />1 <br />No of Compartments:Internal Tnk Lining Dt: <br />01/01/1984YES <br />Tank Installation Dt:Tnk Dsgn Single Wall: <br />05/08/1986NO <br />Tank Registration Dt:Tnk Dsgn Double Wll: <br />IN USEYES <br />Status:Piping Dsgn Sngl Wll: <br />01/01/1984NO <br />Tnk Status Begin Dt:Piping Dsgn Dbl Wll: <br />10000 <br />Capacity (gal): <br /> <br />Tank External Containment <br /> <br />NO <br />Factory-Built Nonmetallic <br />Jacket: <br />NO <br />Synth. Tank Pit/Piping-Trench <br />Liner: <br />NO <br />Tank Vault/Rigid Trench Liner: <br /> <br />Piping External Containment <br /> <br />NO <br />Factory-Built Nonmetallic <br />Jacket: <br />NO <br />Synth. Tank Pit/Piping-Trench <br />Liner: <br />NO <br />Tank Vault/Rigid Trench Liner: <br />P <br />Type of Piping Code: <br />Pressurized <br />Type of Piping Description: <br /> <br />Tank Material <br /> <br />YES <br />Steel: <br />NO <br />FRP (Fiberglass Reinforced <br />Plastic): <br />NO <br />Composite (Steel w/External <br />FRP): <br />NO <br />Concrete: <br />NO <br />Steel w/External Jacket: <br />erisinfo.com | Environmental Risk Information ServicesOrder No: 20170209076 <br />20 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.