Laserfiche WebLink
Houston Port Region Freight Improvement Strategic Plan <br />#ProjectPriorityInfo & Updates <br />1August of 2019 Intersection improvements (not Direct Connectors) <br />Barbours Cut Direct Connectors H/STerminal and the SH 146/SH 225 interchange to determine the impacts of a direct connector <br />2Widen to 6 main lanes <br />Environmentally cleared <br />Final design underway/anticipated to let in Fall 2022 <br />SH-146 Widening - Fairmont to Red Bluff RoadH/SThe total cost of this project is approximately $42 million <br />3SH-225 expansion/improvement (8-East 146)H/S <br />4Broadway Double Track ProjectH/SThis may be in the TIP for FY 2017 as MPOID 17017 - please verify <br />5Design-Build Project/recently awarded <br />The total cost of this project is approximately $1.4 Billion <br />Estimated completion date is February 2022 <br />Grand Parkway NE Segments H & IH/SConstruction to being Summer 2018 <br />6H/S <br />7H/S <br />8MPOID 17113; FY 2024 Project from FM 1409 to SH 99: Reconstruct and realign <br />H/Sroadway is anticipated to let for construction in FY 2018 <br />9Working with HCTRA <br />Construction of 4 connectors is funded <br />Applying for Federal Grant for the remain work <br />Environmental studies underway <br />No ROW needed <br />BW-8 Direct Connectors @ SH-225: Westbound on 225 to 8 N, Northbound on Anticipated letting in 2021 <br />8 to E/W 225, Eastbound on 225 to 8SH/MEstimate construction cost for entire interchange is $180 Million <br />10The grade separation/freeway starts at Alexander and continues all the way to Red Bluff. There probably needs to be some <br />SH146 from I10 to Business 146 (Alexander Drive)work on SH146 North of 110 through Mont Belvieu also <br />11Penn City ConnectorH/M <br />12Barbours Cut Blvd expansion to 6 lanes H/MTXDOT in talks with Port Houston <br />13SH-225 expansion/improvement (8-West 610)H/M <br />14Potentially starting as far South as Wharton and tying as far North as Cleveland <br />Potential to use SH 99 Seg. H & I <br />I-69 Bypass (feasibility of a bypass on the East side of Houston is being Southern Section of an I-69 Bypass is being discussed through HGAC <br />considered)H/MTxDOT is beginning an Origin-Destination Study (O-D) to determine how many trucks would use the route <br />15 <br />Fairmont Parkway (Turning improvements) H/MUnder construction County and La Porte funded through TxDOT Grant <br />16SH-225 and I-610 InterchangeH/LTxDOT is working with H-GAC to begin a feasibility study for SH 225 from I-610 to SH 146 <br />17I-610 bridge at HSCH/LAdditional meetings with the Economic Alliance are requested to identify the needs and project scope at this location <br />18Widening is recommended from Canada Rd to SH 146. There are at least 3 major freight generators on the south side of <br />Fairmont Parkway (Widening)H/LFairmont in this area. <br />19Port Road Phase 3 & Drainage M/MRelated project: MPOID 10452 in FY 2020 widens Port Rd. from SH 146 to Todville <br />20Construct Northbound to Eastbound connection <br />Working to secure construction funding <br />The estimated let date is Spring 2022 <br />SH-330 (improve northbound connectivity to I-10 - 2 lanes or direct connect)M/MThe total cost of this project is approximately $10 million <br />21Independence Parkway (improve Northbound connectivity to SH-225)M/Mdedicated turning lane. Getting those trucks in and out of Ind. Blvd. Increase turning capacity <br />22Spencer Highway Bridge (Bayport Rail Mainline) at FairmontM/LMPOID 10532; FY 2018 <br />23Bayport Mainline Rail TrackM/LMPOID 10455; FY 2017 <br />24Sheldon Road expansion M/LCounty updating cost estimate of project <br />25Applet Road (Sheldon to Market) M/L <br />26Jacintoport Road Improvement L/LAlso on the Primary Highway Freight System, thereby eligible for federal freight funding <br />27Jacintoport Direct Connectors L/LDirect Connect makes it a TxDOT/HCTRA discussion <br />28Haden Rd (extension to Penn City Rd) L/LCounty roadway/POHA <br />TxDOT Projects shadedPriority Level: Time Frame Required: <br />Harris County ProjectsH - HIGH Priority / S - SHORT Term 0-5 yrs <br />19 <br />M - MEDIUM Priority / M - MID Term 5-10 yrs <br />L - LOW Priority / L - LONG Term 10+ yrs <br /> <br />