Laserfiche WebLink
I W4 fa I I H <br />Preliminary Construction Cost Estimate <br />Approximate 9.60-Acre Residential Development at the Northwest Corner <br />of McCabe Road and Old SH 146 <br />NO. <br />=DES0 <br />CFZTI-N <br />-.Su <br />_7 <br />P&cT <br />mxr <br />I <br />NIbtE==r- for Fntira Cmn-t <br />r-S <br />1,00 <br />SM00100 <br />2 <br />Clamr-f & Cntbingg af. Site <br />PIG <br />3 <br />T, ?,EkfWC--i Con=e P;=, <br />SI: <br />6,M,()G <br />$47.50 <br />S2P1,125M <br />4 <br />MazimCzuou of'Lime Subjn& <br />SY <br />6,W)OW <br />$2.25, <br />S15,3DO.00 <br />5 <br />Wdrated L=-- —7=& SlL=v <br />TCNI <br />2M.00 <br />$150.00 <br />6 <br />61, rIM-eU utia <br />LF <br />3, 700,0D <br />SIN <br />S21,101W <br />7 <br />2.5" MEAC <br />TON <br />2-5.00 <br />Wa.100 <br />54,000.00 <br />a <br />12'Ceme='SttL7keiC"suhkd <br />TO <br />103.00 <br />S120.00 <br />S12,000.00 <br />cb=ntp <br />9 <br />Slabgaed Ccas=non E= <br />SY <br />21,00 <br />M00 <br />SPIAOM <br />ch-rall & F�e=-e) <br />10 <br />M, arFabdc Fmce <br />LF <br />4,0010.00 <br />$1.50 <br />S6,000.0) <br />Total Sectiazi "'- PAVLNG <br />$433.135 <br />C-I <br />1-1OU37065512 <br />